KINGSTON SEWELL safety activity
MSHA violations, accident reports and inspections.
Safety activity
Regular Safety and Health Inspection
47.3 on-site hours reported
Electrical equipment.
30 CFR 77.1914(a) · $151.00 proposed penalty
Spot Inspection
10.0 on-site hours reported
Loading and haulage equipment; installations.
30 CFR 77.1605(k) · $177.00 proposed penalty
Travelways at surface installations.
30 CFR 77.205(e) · $151.00 proposed penalty
Electric distribution circuits and equipment; repair.
30 CFR 77.501 · Significant and substantial (S&S) · $3,022.00 proposed penalty
Machinery and equipment; operation and maintenance.
30 CFR 77.404(a) · $151.00 proposed penalty
Flammable liquids; storage.
30 CFR 77.1103(d) · $151.00 proposed penalty
Flammable liquids; storage.
30 CFR 77.1103(d) · $151.00 proposed penalty
Electrical
Days away from work only
Accident narrative
The injured employee and a 3rd Part Electrical Engineer were troubleshooting a permissible line splitter. A faulty monitor was identified, the 110 volt circuit was de-energized and the employee proceeded to remove the monitor. Both electricians believed the high voltage was de-energized and during the monitor removal, the employee contacted a phase of the energized high voltage.
Non-Fatal Accident Investigation
21.5 on-site hours reported
Violation — cited standard not reported
Compliance with approved slope and shaft sinking plans.
30 CFR 77.1900-1 · Significant and substantial (S&S) · $883.00 proposed penalty
Machinery
No dys awy frm wrk,no rstr act
Accident narrative
Employee was struck in the back of right upper thigh with a piece of carbide from the continuous miner bit, causing a puncture wound requiring 5 sutures. Employee returned to work on their next scheduled shift.
Regular Safety and Health Inspection
95.5 on-site hours reported
Electric equipment; examination, testing, and maintenance.
30 CFR 77.502 · $151.00 proposed penalty
Travelways at surface installations.
30 CFR 77.205(a) · $151.00 proposed penalty
Shaft, Slope or Major Construction Spot Inspection
6.0 on-site hours reported
Spot Inspection
8.5 on-site hours reported
Highwalls, pits and spoil banks; plans.
30 CFR 77.1000 · $151.00 proposed penalty
Travelways at surface installations.
30 CFR 77.205(e) · $151.00 proposed penalty
Shaft, Slope or Major Construction Spot Inspection
5.5 on-site hours reported
Examination and maintenance of firefighting equipment.
30 CFR 77.1110 · $151.00 proposed penalty
Regular Safety and Health Inspection
54.0 on-site hours reported
Travelways at surface installations.
30 CFR 77.205(e) · Significant and substantial (S&S) · $398.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.