← Kennedale Prop

Kennedale Prop safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-28Database snapshot · 2026-10-28

Safety activity

  1. Regular Safety and Health Inspection

    inspectionRecord F037A26

    7.8 on-site hours reported

  2. General requirements.

    violationRecord 5008768

    30 CFR 56.4200(b)(2)

  3. First-aid materials.

    violationRecord 5179658

    30 CFR 56.15001 · $151.00 proposed penalty

  4. Regular Safety and Health Inspection

    inspectionRecord F04176F

    14.8 on-site hours reported

  5. Annual refresher training.

    violationRecord 5179657

    30 CFR 46.8 · $168.00 proposed penalty

  6. Preparation and submission of MSHA Form 7000-2—Quarterly Employment and Coal Production Report.

    violationRecord 5179656

    30 CFR 50.30(a) · $151.00 proposed penalty

  7. Inspection.

    violationRecord 5179655

    30 CFR 56.4201(a)(2) · $151.00 proposed penalty

  8. Inspection.

    violationRecord 5179654

    30 CFR 56.4201(a)(2) · $151.00 proposed penalty

  9. Compliance Follow-up Inspection

    inspectionRecord 6934090

    4.5 on-site hours reported

  10. Regular Safety and Health Inspection

    inspectionRecord 6934088

    8.0 on-site hours reported

  11. Examination of working places.

    violationRecord 9795111

    30 CFR 56.18002(a) · Significant and substantial (S&S) · $959.00 proposed penalty

  12. Requirements for written safety program.

    violationRecord 9795110

    30 CFR 56.23003(b) · $151.00 proposed penalty

  13. Extinguisher recharging or replacement.

    violationRecord 9795109

    30 CFR 56.4203 · $193.00 proposed penalty

  14. Safety defects; examination, correction and records.

    violationRecord 9795108

    30 CFR 56.14100(c) · $193.00 proposed penalty

  15. Requirement for container labels.

    violationRecord 9795107

    30 CFR 47.41(a) · $193.00 proposed penalty

  16. Safety defects; examination, correction and records.

    violationRecord 9795106

    30 CFR 56.14100(a) · $193.00 proposed penalty

  17. Safe access.

    violationRecord 9795105

    30 CFR 56.11001 · Significant and substantial (S&S) · $959.00 proposed penalty

  18. Extinguisher recharging or replacement.

    violationRecord 9795104

    30 CFR 56.4203 · $193.00 proposed penalty

  19. Horns and backup alarms.

    violationRecord 9795103

    30 CFR 56.14132(b)(2) · $193.00 proposed penalty

  20. General requirements.

    violationRecord 9795102

    30 CFR 56.4200(a)(1) · $193.00 proposed penalty

  21. Compliance Follow-up Inspection

    inspectionRecord F019A89

    1.0 on-site hours reported

  22. Regular Safety and Health Inspection

    inspectionRecord F019A86

    7.0 on-site hours reported

  23. Preparation and submission of MSHA Form 7000-2—Quarterly Employment and Coal Production Report.

    violationRecord 5004017

    30 CFR 50.30(a) · $151.00 proposed penalty

  24. Operators stations.

    violationRecord 5004016

    30 CFR 56.14103(b) · Significant and substantial (S&S) · $959.00 proposed penalty

  25. Operators stations.

    violationRecord 5004015

    30 CFR 56.14103(b) · Significant and substantial (S&S) · $959.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.