← Kellerman

Kellerman safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Regular Safety and Health Inspection

    inspectionRecord F015908

    136.3 on-site hours reported

  2. Preshift examination at fixed intervals.

    violationRecord 9824141

    30 CFR 75.360(b)(11)(i) · Significant and substantial (S&S) · $465.00 proposed penalty

  3. Roof control plan.

    violationRecord 9824140

    30 CFR 75.220(a)(1) · $151.00 proposed penalty

  4. Roof control plan.

    violationRecord 9824139

    30 CFR 75.220(a)(1) · Significant and substantial (S&S) · $465.00 proposed penalty

  5. Protection from falls of roof, face and ribs.

    violationRecord 9824138

    30 CFR 75.202(a) · $151.00 proposed penalty

  6. Temporary notations, revisions, and supplements.

    violationRecord 5060064

    30 CFR 75.1202-1(b)(3) · $151.00 proposed penalty

  7. Accumulation of combustible materials.

    violationRecord 5060063

    30 CFR 75.400 · Significant and substantial (S&S) · $883.00 proposed penalty

  8. Roof Control Technical Investigation

    inspectionRecord 6920857

    21.3 on-site hours reported

  9. Permissible electric face equipment; maintenance.

    violationRecord 9825169

    30 CFR 75.503 · $193.00 proposed penalty

  10. Permissible electric face equipment; maintenance.

    violationRecord 5060059

    30 CFR 75.503 · $193.00 proposed penalty

  11. Short circuit protection; ratings and settings of circuit breakers.

    violationRecord 5060053

    30 CFR 75.601-1 · $313.00 proposed penalty

  12. Short circuit protection; ratings and settings of circuit breakers.

    violationRecord 5060052

    30 CFR 75.601-1 · $1,037.00 proposed penalty

  13. Short circuit protection; ratings and settings of circuit breakers.

    violationRecord 5060051

    30 CFR 75.601-1 · $313.00 proposed penalty

  14. Additional self-contained self-rescuers (SCSRs).

    violationRecord 5060050

    30 CFR 75.1714-4(b) · $313.00 proposed penalty

  15. Machinery and equipment; operation and maintenance.

    violationRecord 5060049

    30 CFR 75.1725(a) · $151.00 proposed penalty

  16. Supplemental support materials, equipment and tools.

    violationRecord 9755715

    30 CFR 75.214(b) · $151.00 proposed penalty

  17. Quantity and location of firefighting equipment.

    violationRecord 9755714

    30 CFR 75.1100-2(a)(1) · $151.00 proposed penalty

  18. Examination and maintenance of firefighting equipment.

    violationRecord 9755708

    30 CFR 77.1110 · $151.00 proposed penalty

  19. Loading and haulage equipment; installations.

    violationRecord 9755707

    30 CFR 77.1605(d) · $151.00 proposed penalty

  20. Loading and haulage equipment; installations.

    violationRecord 9755706

    30 CFR 77.1605(d) · $151.00 proposed penalty

  21. Quarterly sampling; mechanized mining units.

    violationRecord 9820735

    30 CFR 70.208(a)(2) · $151.00 proposed penalty

  22. Roof Control Technical Investigation

    inspectionRecord 6920854

    6.8 on-site hours reported

  23. Regular Safety and Health Inspection

    inspectionRecord 6976144

    120.0 on-site hours reported

  24. Mechanical equipment guards.

    violationRecord 9824115

    30 CFR 75.1722(a) · Significant and substantial (S&S) · $697.00 proposed penalty

  25. Mine emergency evacuation training and drills.

    violationRecord 9824114

    30 CFR 75.1504(a) · $151.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.