Jerry Fork Eagle safety activity
MSHA violations, accident reports and inspections.
Safety activity
Identification check system.
30 CFR 75.1715 · $151.00 proposed penalty
Spot Inspections
103(i) · 6.0 on-site hours reported
Regular Safety and Health Inspection
405.3 on-site hours reported
Spot Inspections
103(i) · 6.0 on-site hours reported
Spot Inspections
103(i) · 7.0 on-site hours reported
Machinery
No dys awy frm wrk,no rstr act
Accident narrative
employee was using grinder and grinder caught on gloves cutting right pinky finger on first knuckle, Finger was almost cut off. the cut did cut the tendons and was taken off work. Each employee will now be trained properly trained on using said machine, do not use any equipment without proper guard in place
Machinery
Days away from work only
Accident narrative
using grinder and caught gloves with grinder cutting right pinky finger on first knuckle
Machinery
No dys awy frm wrk,no rstr act
Accident narrative
Removed lagging from drive roller and was buffering and cleaning up drum to install new lagging grinder got caught and kicked back resulting in laceration to pinky finger on right hand and small cut on ring finger .
Spot Inspections
103(i) · 7.0 on-site hours reported
Other safeguards.
30 CFR 75.1403 · $313.00 proposed penalty
Other safeguards.
30 CFR 75.1403 · $288.00 proposed penalty
Spot Inspections
103(i) · 9.8 on-site hours reported
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · $642.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $549.00 proposed penalty
Methane monitors.
30 CFR 75.342(a)(4) · $151.00 proposed penalty
Spot Inspections
103(i) · 7.5 on-site hours reported
Protection from falls of roof, face and ribs.
30 CFR 75.202(a) · $366.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
30 CFR 75.1731(a) · $504.00 proposed penalty
Spot Inspections
103(i) · 8.0 on-site hours reported
Mine ventilation plan; submission and approval.
30 CFR 75.370(e) · $642.00 proposed penalty
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · $17,082.00 proposed penalty
Spot Inspections
103(i) · 8.0 on-site hours reported
Electric equipment; examination, testing and maintenance.
30 CFR 75.512 · $336.00 proposed penalty
Spot Inspections
103(i) · 12.0 on-site hours reported
Spot Inspections
103(i) · 12.0 on-site hours reported
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.