← Itmann No 5

Itmann No 5 safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Verbal Hazard Complaint Inspections

    inspectionRecord F010C48

    6.0 on-site hours reported

  2. Machinery and equipment; operation and maintenance.

    violationRecord 5090593

    30 CFR 75.1725(a) · $151.00 proposed penalty

  3. Machinery and equipment; operation and maintenance.

    violationRecord 5090592

    30 CFR 75.1725(a) · Significant and substantial (S&S) · $1,037.00 proposed penalty

  4. Permissible electric face equipment; maintenance.

    violationRecord 5090591

    30 CFR 75.503 · $151.00 proposed penalty

  5. Spot Inspections

    inspectionRecord F010C47

    103(i) · 7.0 on-site hours reported

  6. Escapeways; bituminous and lignite mines.

    violationRecord 5090590

    30 CFR 75.380(d)(1) · Significant and substantial (S&S) · $2,312.00 proposed penalty

  7. Escapeway maps.

    violationRecord 5090589

    30 CFR 75.1505(a) · $818.00 proposed penalty

  8. Escapeway maps.

    violationRecord 5090588

    30 CFR 75.1505(b) · $245.00 proposed penalty

  9. Verbal Hazard Complaint Inspections

    inspectionRecord F00D97C

    4.5 on-site hours reported

  10. Mine ventilation plan; submission and approval.

    violationRecord 9839192

    30 CFR 75.370(a)(1) · $151.00 proposed penalty

  11. Ventilation controls.

    violationRecord 5090587

    30 CFR 75.333(h) · $151.00 proposed penalty

  12. Verbal Hazard Complaint Inspections

    inspectionRecord F010C45

    0.5 on-site hours reported

  13. Preshift examination at fixed intervals.

    violationRecord 5090583

    30 CFR 75.360(b) · $818.00 proposed penalty

  14. Mine ventilation plan; submission and approval.

    violationRecord 5090582

    30 CFR 75.370(d) · $818.00 proposed penalty

  15. Protection from falls of roof, face and ribs.

    violationRecord 5090581

    30 CFR 75.202(a) · $151.00 proposed penalty

  16. Escapeways; bituminous and lignite mines.

    violationRecord 5090580

    30 CFR 75.380(d)(1) · $151.00 proposed penalty

  17. Escapeway maps.

    violationRecord 5090579

    30 CFR 75.1505(b) · $818.00 proposed penalty

  18. Accumulation of combustible materials.

    violationRecord 5090578

    30 CFR 75.400 · $288.00 proposed penalty

  19. Spot Inspections

    inspectionRecord F010C44

    103(i) · 9.8 on-site hours reported

  20. Permissible electric face equipment; maintenance.

    violationRecord 5090577

    30 CFR 75.503 · $226.00 proposed penalty

  21. Power wires and cables; insulation and protection.

    violationRecord 5090576

    30 CFR 75.517 · $209.00 proposed penalty

  22. Permissible electric face equipment; maintenance.

    violationRecord 5090575

    30 CFR 75.503 · $226.00 proposed penalty

  23. Accumulation of combustible materials.

    violationRecord 5090574

    30 CFR 75.400 · $336.00 proposed penalty

  24. Spot Inspections

    inspectionRecord F02B617

    103(i) · 9.0 on-site hours reported

  25. Mine ventilation plan; submission and approval.

    violationRecord 5091049

    30 CFR 75.370(a)(1) · $151.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.