Itmann No 5 safety activity
MSHA violations, accident reports and inspections.
Safety activity
Permissible electric face equipment; maintenance.
30 CFR 75.503 · $151.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $267.00 proposed penalty
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · $209.00 proposed penalty
Electrical connections or splices; suitability.
30 CFR 75.514 · $465.00 proposed penalty
Criteria—Belt conveyors.
30 CFR 75.1403-5(g) · $151.00 proposed penalty
Preshift examination at fixed intervals.
30 CFR 75.360(g) · $151.00 proposed penalty
Mechanical equipment guards.
30 CFR 75.1722(a) · $151.00 proposed penalty
Spot Inspections
103(i) · 7.5 on-site hours reported
Face ventilation control devices.
30 CFR 75.330(b)(2) · $209.00 proposed penalty
Ventilation controls.
30 CFR 75.333(h) · $151.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $267.00 proposed penalty
Preshift examination at fixed intervals.
30 CFR 75.360(f) · $151.00 proposed penalty
Other safeguards.
30 CFR 75.1403
Loading and haulage equipment; installations.
30 CFR 77.1605(k) · Significant and substantial (S&S) · $465.00 proposed penalty
Electrical connections or splices; suitability.
30 CFR 77.504 · $209.00 proposed penalty
Criteria—Belt conveyors.
30 CFR 75.1403-5(g) · $697.00 proposed penalty
Escapeway maps.
30 CFR 75.1505(b) · $818.00 proposed penalty
Preshift examination at fixed intervals.
30 CFR 75.360(g) · $151.00 proposed penalty
Spot Inspections
103(i) · 6.0 on-site hours reported
Occupational skin diseases
Occupatnal illness not deg 1-6
Accident narrative
EE was spreading calcium in the intake at break #13 on #1 belt. EE had allergic reaction causing a skin rash on both legs
Roof control plan.
30 CFR 75.220(a)(1) · Significant and substantial (S&S) · $2,312.00 proposed penalty
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · $151.00 proposed penalty
Protection from falls of roof, face and ribs.
30 CFR 75.202(a) · Significant and substantial (S&S) · $1,037.00 proposed penalty
Power centers.
30 CFR 75.825(c) · $151.00 proposed penalty
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · Significant and substantial (S&S) · $465.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.