Safety activity

  1. Mine ventilation plan; submission and approval.

    violationRecord 5090156

    30 CFR 75.370(a)(1) · $465.00 proposed penalty

  2. Verbal Hazard Complaint Inspections

    inspectionRecord 7048788

    5.0 on-site hours reported

  3. Accumulation of combustible materials.

    violationRecord 5091074

    30 CFR 75.400 · $267.00 proposed penalty

  4. Roof control plan.

    violationRecord 5091073

    30 CFR 75.220(a)(1) · $1,037.00 proposed penalty

  5. Verbal Hazard Complaint Inspections

    inspectionRecord F010C4A

    5.5 on-site hours reported

  6. Roof control plan.

    violationRecord 5092011

    30 CFR 75.220(a)(1) · $209.00 proposed penalty

  7. Mine ventilation plan; submission and approval.

    violationRecord 5092010

    30 CFR 75.370(a)(1) · $151.00 proposed penalty

  8. Protection from falls of roof, face and ribs.

    violationRecord 5092009

    30 CFR 75.202(a) · $151.00 proposed penalty

  9. Escapeway maps.

    violationRecord 5092008

    30 CFR 75.1505(b) · $818.00 proposed penalty

  10. Verbal Hazard Complaint Inspections

    inspectionRecord F02B61B

    2.0 on-site hours reported

  11. Spot Inspections

    inspectionRecord F010C49

    103(i) · 8.5 on-site hours reported

  12. Criteria—Belt conveyors.

    violationRecord 5092007

    30 CFR 75.1403-5(j) · $151.00 proposed penalty

  13. Methane monitors.

    violationRecord 5092006

    30 CFR 75.342(a)(4) · $151.00 proposed penalty

  14. Mine ventilation plan; submission and approval.

    violationRecord 5092005

    30 CFR 75.370(a)(1) · Significant and substantial (S&S) · $504.00 proposed penalty

  15. Criteria—Mantrips.

    violationRecord 5092004

    30 CFR 75.1403-7(o) · $697.00 proposed penalty

  16. Spot Inspections

    inspectionRecord F02B61A

    103(i) · 9.0 on-site hours reported

  17. Escapeways; bituminous and lignite mines.

    violationRecord 5091070

    30 CFR 75.380(d)(6) · $549.00 proposed penalty

  18. Methane monitors.

    violationRecord 5091069

    30 CFR 75.342(a)(4) · $1,126.00 proposed penalty

  19. Mine ventilation plan; submission and approval.

    violationRecord 5091068

    30 CFR 75.370(a)(1) · $151.00 proposed penalty

  20. Roof control plan.

    violationRecord 5091067

    30 CFR 75.220(a)(1) · $267.00 proposed penalty

  21. Electric equipment; examination, testing and maintenance.

    violationRecord 5091066

    30 CFR 75.512 · $151.00 proposed penalty

  22. Violation — cited standard not reported

    violationRecord 5091607
  23. Non-Injury Accident Investigation

    inspectionRecord F009F4C

    26.8 on-site hours reported

  24. Mine ventilation plan; submission and approval.

    violationRecord 5091065

    30 CFR 75.370(a)(1) · $151.00 proposed penalty

  25. Accumulation of combustible materials.

    violationRecord 5091064

    30 CFR 75.400 · $267.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.