← Itmann No 5

Itmann No 5 safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Ventilation controls.

    violationRecord 5090871

    30 CFR 75.333(d)(3) · $151.00 proposed penalty

  2. Protection of trailing cables.

    violationRecord 5090870

    30 CFR 75.606 · $267.00 proposed penalty

  3. Power wires and cables; insulation and protection.

    violationRecord 5090869

    30 CFR 75.517 · $267.00 proposed penalty

  4. Protection from falls of roof, face and ribs.

    violationRecord 5090868

    30 CFR 75.202(a) · Significant and substantial (S&S) · $883.00 proposed penalty

  5. Spot Inspections

    inspectionRecord F017F2B

    103(i) · 5.0 on-site hours reported

  6. Mine ventilation plan; submission and approval.

    violationRecord 5091140

    30 CFR 75.370(a)(1) · Significant and substantial (S&S) · $2,503.00 proposed penalty

  7. Certification.

    violationRecord 5091139

    30 CFR 75.1201 · $151.00 proposed penalty

  8. Preshift examination at fixed intervals.

    violationRecord 5091138

    30 CFR 75.360(g) · $151.00 proposed penalty

  9. Power wires and cables; insulation and protection.

    violationRecord 5090867

    30 CFR 75.517 · $267.00 proposed penalty

  10. Roof control plan.

    violationRecord 5090866

    30 CFR 75.220(a)(1) · Significant and substantial (S&S) · $1,968.00 proposed penalty

  11. Ventilation controls.

    violationRecord 5090865

    30 CFR 75.333(d)(3) · $151.00 proposed penalty

  12. Protection from falls of roof, face and ribs.

    violationRecord 5090864

    30 CFR 75.202(a) · $151.00 proposed penalty

  13. Accumulation of combustible materials.

    violationRecord 5090863

    30 CFR 75.400 · $165.00 proposed penalty

  14. Ventilation controls.

    violationRecord 5090862

    30 CFR 75.333(d)(3) · $151.00 proposed penalty

  15. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 5092815

    30 CFR 75.1731(a) · $151.00 proposed penalty

  16. Accumulation of combustible materials.

    violationRecord 5092814

    30 CFR 75.400 · $465.00 proposed penalty

  17. On-shift examination.

    violationRecord 5092813

    30 CFR 75.362(g)(2)(i) · $151.00 proposed penalty

  18. Spot Inspections

    inspectionRecord F017F28

    103(i) · 5.5 on-site hours reported

  19. Mine ventilation plan; submission and approval.

    violationRecord 5091134

    30 CFR 75.370(a)(1) · $432.00 proposed penalty

  20. Permissible electric face equipment; maintenance.

    violationRecord 5091133

    30 CFR 75.503 · $193.00 proposed penalty

  21. Spot Inspections

    inspectionRecord F017F27

    103(i) · 5.5 on-site hours reported

  22. Mine ventilation plan; submission and approval.

    violationRecord 5091132

    30 CFR 75.370(a)(1) · $193.00 proposed penalty

  23. Spot Inspections

    inspectionRecord F009F56

    103(i) · 6.8 on-site hours reported

  24. Temporary notations, revisions, and supplements.

    violationRecord 5091625

    30 CFR 75.1202-1(b)(3) · $151.00 proposed penalty

  25. Mine ventilation plan; submission and approval.

    violationRecord 5091624

    30 CFR 75.370(a)(1) · $151.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.