  1. Locking transformer enclosures.

    violationRecord 9892546

    30 CFR 56.12068 · $549.00 proposed penalty

  2. Protection of gas cylinder valves.

    violationRecord 9892545

    30 CFR 56.16006 · $1,219.00 proposed penalty

  3. Handrails and toeboards.

    violationRecord 9890654

    30 CFR 56.11002 · $366.00 proposed penalty

  4. Guarding electrical connections and resistor grids.

    violationRecord 9890653

    30 CFR 56.12023 · $592.00 proposed penalty

  5. Housekeeping.

    violationRecord 9890652

    30 CFR 56.20003(a) · Significant and substantial (S&S) · $1,818.00 proposed penalty

  6. Inspection and cover plates.

    violationRecord 9890651

    30 CFR 56.12032 · $2,712.00 proposed penalty

  7. Moving machine parts.

    violationRecord 9890650

    30 CFR 56.14107(a) · $245.00 proposed penalty

  8. Regular Safety and Health Inspection

    inspectionRecord 6967187

    28.8 on-site hours reported

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.