Regular Safety and Health Inspection
10.3 on-site hours reported
Moving machine parts.
30 CFR 56.14107(a)
Safety defects; examination, correction and records.
30 CFR 56.14100(c)
Spot Inspection
12.3 on-site hours reported
Regular Safety and Health Inspection
20.0 on-site hours reported
Spot Inspection
5.3 on-site hours reported
Correction of dangerous conditions.
30 CFR 56.12030 · $313.00 proposed penalty
Spillage and leakage.
30 CFR 56.4102 · Significant and substantial (S&S) · $5,716.00 proposed penalty
Operators stations.
30 CFR 56.14103(b) · Significant and substantial (S&S) · $5,716.00 proposed penalty
Safety defects; examination, correction and records.
30 CFR 56.14100(c) · Significant and substantial (S&S) · $5,144.00 proposed penalty
Regular Safety and Health Inspection
25.5 on-site hours reported
Safety defects; examination, correction and records.
30 CFR 56.14100(d) · $226.00 proposed penalty
Safety defects; examination, correction and records.
30 CFR 56.14100(b) · $209.00 proposed penalty
Safety defects; examination, correction and records.
30 CFR 56.14100(b) · $151.00 proposed penalty
Seat belts for haulage trucks.
30 CFR 56.14131(b) · $151.00 proposed penalty
Insulation and fittings for power wires and cables.
30 CFR 56.12008 · $151.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.