  1. Stacking and storage of materials.

    violationRecord 5106033

    30 CFR 56.16001 · $245.00 proposed penalty

  2. General requirements.

    violationRecord 5106032

    30 CFR 56.4200(b)(2) · $151.00 proposed penalty

  3. Housekeeping.

    violationRecord 5106031

    30 CFR 56.20003(c) · $245.00 proposed penalty

  4. Moving machine parts.

    violationRecord 5106030

    30 CFR 56.14107(a) · $366.00 proposed penalty

  5. Stacking and storage of materials.

    violationRecord 5106029

    30 CFR 56.16001 · $245.00 proposed penalty

  6. Identification of power switches.

    violationRecord 5106028

    30 CFR 56.12018 · $245.00 proposed penalty

  7. First-aid materials.

    violationRecord 5106027

    30 CFR 56.15001 · $165.00 proposed penalty

  8. Safety defects; examination, correction and records.

    violationRecord 5106026

    30 CFR 56.14100(b) · $151.00 proposed penalty

  9. Safety defects; examination, correction and records.

    violationRecord 5106025

    30 CFR 56.14100(b) · $151.00 proposed penalty

  10. Inspection and cover plates.

    violationRecord 9999580

    30 CFR 56.12032 · $151.00 proposed penalty

  11. Requirement for container labels.

    violationRecord 9999579

    30 CFR 47.41(a) · $245.00 proposed penalty

  12. Construction and maintenance of guards.

    violationRecord 9999578

    30 CFR 56.14112(b) · $245.00 proposed penalty

  13. Inspection.

    violationRecord 9999577

    30 CFR 56.4201(a)(1) · $245.00 proposed penalty

  14. Regular Safety and Health Inspection

    inspectionRecord F023B97

    48.5 on-site hours reported

  15. Preparation and submission of MSHA Form 7000-2—Quarterly Employment and Coal Production Report.

    violationRecord 9892735

    30 CFR 50.30(a) · $432.00 proposed penalty

  16. Housekeeping.

    violationRecord 9892734

    30 CFR 56.20003(a) · Significant and substantial (S&S) · $1,431.00 proposed penalty

  17. Housekeeping.

    violationRecord 9892733

    30 CFR 56.20003(a) · Significant and substantial (S&S) · $1,431.00 proposed penalty

  18. Safe access.

    violationRecord 9892732

    30 CFR 56.11001 · $193.00 proposed penalty

  19. Inspection and cover plates.

    violationRecord 9892731

    30 CFR 56.12032 · $432.00 proposed penalty

  20. Housekeeping.

    violationRecord 9892730

    30 CFR 56.20003(a) · Significant and substantial (S&S) · $1,431.00 proposed penalty

  21. Securing gas cylinders.

    violationRecord 9892729

    30 CFR 56.16005 · $432.00 proposed penalty

  22. Handrails and toeboards.

    violationRecord 9892728

    30 CFR 56.11002 · Significant and substantial (S&S) · $1,219.00 proposed penalty

  23. Insulation and fittings for power wires and cables.

    violationRecord 9892727

    30 CFR 56.12008 · $245.00 proposed penalty

  24. Insulation and fittings for power wires and cables.

    violationRecord 9892726

    30 CFR 56.12008 · $245.00 proposed penalty

  25. Housekeeping.

    violationRecord 9892725

    30 CFR 56.20003(a) · Significant and substantial (S&S) · $2,312.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.