Imerys Lompoc Plant safety activity
MSHA violations, accident reports and inspections.
Safety activity
Inspection and cover plates.
30 CFR 56.12032 · $2,936.00 proposed penalty
Inspection and cover plates.
30 CFR 56.12032 · $6,540.00 proposed penalty
Electrical conductors.
30 CFR 56.12004 · $267.00 proposed penalty
Regular Safety and Health Inspection
82.8 on-site hours reported
Handling of materials
Days away from work only
Accident narrative
Bilateral pain in hands & wrists; experienced initial pain while hand stacking 10kg bags at the Celpure plant.
Testing grounding systems.
30 CFR 56.12028 · Significant and substantial (S&S) · $2,936.00 proposed penalty
Construction and maintenance of guards.
30 CFR 56.14112(b) · $883.00 proposed penalty
Examination of working places.
30 CFR 56.18002(a) · Significant and substantial (S&S) · $1,037.00 proposed penalty
Protection of persons at switchgear.
30 CFR 56.12020 · $697.00 proposed penalty
Construction and maintenance of guards.
30 CFR 56.14112(b) · $209.00 proposed penalty
Heat sources.
30 CFR 56.4500 · $151.00 proposed penalty
Stacking and storage of materials.
30 CFR 56.16001 · $151.00 proposed penalty
Stacking and storage of materials.
30 CFR 56.16001 · Significant and substantial (S&S) · $1,219.00 proposed penalty
Stacking and storage of materials.
30 CFR 56.16001 · Significant and substantial (S&S) · $4,047.00 proposed penalty
Parking procedures for unattended equipment.
30 CFR 56.14207 · $366.00 proposed penalty
Inspection and cover plates.
30 CFR 56.12032 · $818.00 proposed penalty
Containers for hazardous materials.
30 CFR 56.16004 · Significant and substantial (S&S) · $1,818.00 proposed penalty
Examination of working places.
30 CFR 56.18002(a) · Significant and substantial (S&S) · $6,037.00 proposed penalty
Moving machine parts.
30 CFR 56.14107(a) · Significant and substantial (S&S) · $1,818.00 proposed penalty
Insulation and fittings for power wires and cables.
30 CFR 56.12008 · $366.00 proposed penalty
Electrical conductors.
30 CFR 56.12004 · $165.00 proposed penalty
Controls and switches.
30 CFR 56.12002 · $818.00 proposed penalty
Controls and switches.
30 CFR 56.12002 · $818.00 proposed penalty
Safety defects; examination, correction and records.
30 CFR 56.14100(b) · Significant and substantial (S&S) · $1,219.00 proposed penalty
Preparation and submission of MSHA Form 7000-2—Quarterly Employment and Coal Production Report.
30 CFR 50.30(a) · $151.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.