Imerys Lompoc Plant safety activity
MSHA violations, accident reports and inspections.
Safety activity
Handling of materials
Days away from work only
Accident narrative
Received a shock from static electricity built up on a pneumatic material transfer hose while attempting to tape a leak on the hose. Sudden movement in response to the shock resulted in a strain injury to the right wrist/forearm.
Testing grounding systems.
30 CFR 56.12028 · $959.00 proposed penalty
Guarding around lights.
30 CFR 56.12034 · $245.00 proposed penalty
Safe access.
30 CFR 56.11001 · Significant and substantial (S&S) · $1,818.00 proposed penalty
Housekeeping.
30 CFR 56.20003(a) · Significant and substantial (S&S) · $2,712.00 proposed penalty
Construction and maintenance of guards.
30 CFR 56.14112(b) · $165.00 proposed penalty
Moving machine parts.
30 CFR 56.14107(a) · $697.00 proposed penalty
Stacking and storage of materials.
30 CFR 56.16001 · Significant and substantial (S&S) · $17,082.00 proposed penalty
Housekeeping.
30 CFR 56.20003(a) · Significant and substantial (S&S) · $2,712.00 proposed penalty
Inspection and cover plates.
30 CFR 56.12032 · $1,037.00 proposed penalty
Insulation and fittings for power wires and cables.
30 CFR 56.12008 · $245.00 proposed penalty
Electrical conductors.
30 CFR 56.12004 · $549.00 proposed penalty
Stacking and storage of materials.
30 CFR 56.16001 · $642.00 proposed penalty
Stacking and storage of materials.
30 CFR 56.16001 · $1,431.00 proposed penalty
Requirement for container labels.
30 CFR 47.41(a) · $209.00 proposed penalty
Construction and maintenance of guards.
30 CFR 56.14112(a)(1) · $209.00 proposed penalty
Abandoned electric circuits.
30 CFR 56.4011 · $209.00 proposed penalty
Housekeeping.
30 CFR 56.20003(b) · $209.00 proposed penalty
Abandoned electric circuits.
30 CFR 56.4011 · $209.00 proposed penalty
Identification of power switches.
30 CFR 56.12018 · $209.00 proposed penalty
Inspection.
30 CFR 56.4201(a)(1) · $592.00 proposed penalty
Splices and repairs of power cables.
30 CFR 56.12013 · $151.00 proposed penalty
Construction and maintenance of guards.
30 CFR 56.14112(b) · $398.00 proposed penalty
Inspection and cover plates.
30 CFR 56.12032 · $1,320.00 proposed penalty
Parking procedures for unattended equipment.
30 CFR 56.14207 · $1,968.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.