HUNTS FORK GLAMORGAN safety activity
MSHA violations, accident reports and inspections.
Safety activity
Automatic emergency-parking brakes.
30 CFR 75.523-3(b)(1) · $151.00 proposed penalty
Electric equipment other than power-connection points; outby the last open crosscut; return air; permissibility requirements.
30 CFR 75.507-1(a) · $151.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $336.00 proposed penalty
Permissible electric face equipment; maintenance.
30 CFR 75.503 · $226.00 proposed penalty
Permissible electric face equipment; maintenance.
30 CFR 75.503 · $165.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $313.00 proposed penalty
Power wires and cables; insulation and protection.
30 CFR 75.517 · Significant and substantial (S&S) · $2,312.00 proposed penalty
Roof control plan.
30 CFR 75.220(a)(1) · $226.00 proposed penalty
Preshift examination at fixed intervals.
30 CFR 75.360(g) · $151.00 proposed penalty
Mechanical equipment guards.
30 CFR 75.1722(b) · Significant and substantial (S&S) · $2,312.00 proposed penalty
Protection from falls of roof, face and ribs.
30 CFR 75.202(a) · Significant and substantial (S&S) · $959.00 proposed penalty
On-shift examination.
30 CFR 75.362(d)(2) · $151.00 proposed penalty
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · Significant and substantial (S&S) · $1,320.00 proposed penalty
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · Significant and substantial (S&S) · $2,503.00 proposed penalty
Permissible electric face equipment; maintenance.
30 CFR 75.503 · $245.00 proposed penalty
Installation of high-voltage transmission cables.
30 CFR 75.807 · $151.00 proposed penalty
Preshift examination at fixed intervals.
30 CFR 75.360(a)(1)
Preshift examination at fixed intervals.
30 CFR 75.360(a)(1) · Significant and substantial (S&S) · $775.00 proposed penalty
Conventional roof support.
30 CFR 75.206(a)(3)(i) · $151.00 proposed penalty
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · $313.00 proposed penalty
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · Significant and substantial (S&S) · $1,126.00 proposed penalty
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · Significant and substantial (S&S) · $1,550.00 proposed penalty
Protection from falls of roof, face and ribs.
30 CFR 75.202(a) · Significant and substantial (S&S) · $432.00 proposed penalty
Protection from falls of roof, face and ribs.
30 CFR 75.202(a) · Significant and substantial (S&S) · $959.00 proposed penalty
Roof control plan.
30 CFR 75.220(a)(1) · $245.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.