Protection of trailing cables.
30 CFR 75.606 · Significant and substantial (S&S) · $1,679.00 proposed penalty
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · $177.00 proposed penalty
Storage of liquefied and nonliquefied compressed gas cylinders; requirements.
30 CFR 75.1106-3(a)(2) · $151.00 proposed penalty
Protection from falls of roof, face and ribs.
30 CFR 75.202(a) · Significant and substantial (S&S) · $336.00 proposed penalty
Grounding offtrack direct-current machines and the enclosures of related detached components.
30 CFR 75.703 · $151.00 proposed penalty
Deenergization of self-propelled electric face equipment installation requirements.
30 CFR 75.523-1(a) · Significant and substantial (S&S) · $336.00 proposed penalty
Ventilation controls.
30 CFR 75.333(d)(3) · $151.00 proposed penalty
Protection from falls of roof, face and ribs.
30 CFR 75.202(a) · Significant and substantial (S&S) · $336.00 proposed penalty
Escapeways; bituminous and lignite mines.
30 CFR 75.380(d)(1) · $151.00 proposed penalty
Deenergization of self-propelled electric face equipment installation requirements.
30 CFR 75.523-1(a) · Significant and substantial (S&S) · $336.00 proposed penalty
Permissible electric face equipment; maintenance.
30 CFR 75.503 · $151.00 proposed penalty
Air quality detectors and measurement devices.
30 CFR 75.320(a) · $151.00 proposed penalty
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · $151.00 proposed penalty
Protection from falls of roof, face and ribs.
30 CFR 75.202(a) · Significant and substantial (S&S) · $1,320.00 proposed penalty
Permissible electric face equipment; maintenance.
30 CFR 75.503 · $209.00 proposed penalty
Machinery and equipment; operation and maintenance.
30 CFR 75.1725(a) · Significant and substantial (S&S) · $592.00 proposed penalty
Regular Safety and Health Inspection
290.3 on-site hours reported
Spot Inspection
2.0 on-site hours reported
Maintenance of incombustible content of rock dust.
30 CFR 75.403 · $245.00 proposed penalty
Maintenance of incombustible content of rock dust.
30 CFR 75.403 · $245.00 proposed penalty
On-shift examination.
30 CFR 75.362(a)(2) · $755.00 proposed penalty
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · $1,320.00 proposed penalty
On-shift examination.
30 CFR 75.362(a)(2) · $267.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
30 CFR 75.1731(a) · $151.00 proposed penalty
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · $366.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.