← Hunter Quarry

Hunter Quarry safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-28Database snapshot · 2026-10-28

Safety activity

  1. Safety defects; examination, correction and records.

    violationRecord 5177710

    30 CFR 56.14100(a) · $366.00 proposed penalty

  2. Brakes.

    violationRecord 5177709

    30 CFR 56.14101(a)(2) · $366.00 proposed penalty

  3. Inspection.

    violationRecord 5177708

    30 CFR 56.4201(a)(2) · $366.00 proposed penalty

  4. Safety defects; examination, correction and records.

    violationRecord 5177707

    30 CFR 56.14100(b) · $366.00 proposed penalty

  5. Safety defects; examination, correction and records.

    violationRecord 5177706

    30 CFR 56.14100(b)

  6. Regular Safety and Health Inspection

    inspectionRecord 6936192

    48.5 on-site hours reported

  7. Warning signs.

    violationRecord 9799396

    30 CFR 56.4101 · $366.00 proposed penalty

  8. High-pressure hose connections.

    violationRecord 9799395

    30 CFR 56.13021 · $366.00 proposed penalty

  9. Requirement for container labels.

    violationRecord 9799394

    30 CFR 47.41(a) · $366.00 proposed penalty

  10. Preparation and submission of MSHA Form 7000-2—Quarterly Employment and Coal Production Report.

    violationRecord 5172624

    30 CFR 50.30(a) · $151.00 proposed penalty

  11. Air receiver tanks.

    violationRecord 5172623

    30 CFR 56.13011 · $959.00 proposed penalty

  12. Housekeeping.

    violationRecord 5172622

    30 CFR 56.20003(a) · $1,126.00 proposed penalty

  13. Housekeeping.

    violationRecord 5172621

    30 CFR 56.20003(b) · $288.00 proposed penalty

  14. Flying or falling materials.

    violationRecord 5172620

    30 CFR 56.14110 · $288.00 proposed penalty

  15. Records of training.

    violationRecord 5172619

    30 CFR 46.9(a) · $151.00 proposed penalty

  16. Preparation and submission of MSHA Form 7000-2—Quarterly Employment and Coal Production Report.

    violationRecord 5172618

    30 CFR 50.30(a) · $151.00 proposed penalty

  17. Training plans.

    violationRecord 5172617

    30 CFR 46.3(a) · $151.00 proposed penalty

  18. Records of training.

    violationRecord 5172616

    30 CFR 46.9 · $151.00 proposed penalty

  19. Newly hired experienced miner training.

    violationRecord 5172615

    30 CFR 46.6(b) · $151.00 proposed penalty

  20. Inspection.

    violationRecord 5172614

    30 CFR 56.4201(a)(1) · $165.00 proposed penalty

  21. Guarding electrical connections and resistor grids.

    violationRecord 5172613

    30 CFR 56.12023 · $165.00 proposed penalty

  22. Housekeeping.

    violationRecord 5006488

    30 CFR 56.20003(b) · Significant and substantial (S&S) · $4,047.00 proposed penalty

  23. Traffic control.

    violationRecord 5006487

    30 CFR 56.9100 · $366.00 proposed penalty

  24. Safe access.

    violationRecord 5006486

    30 CFR 56.11001 · Significant and substantial (S&S) · $2,712.00 proposed penalty

  25. Dump site restraints.

    violationRecord 5006485

    30 CFR 56.9301 · Significant and substantial (S&S) · $6,037.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.