Handling of materials
Days away from work only
Accident narrative
doing a lift to a piece of steel got hang up but release and on the bounce of the piece landed on EE's right foot, injure required 7 stiches
Housekeeping.
30 CFR 56.20003(a) · $3,736.00 proposed penalty
Examination of working places.
30 CFR 56.18002 · $288.00 proposed penalty
Housekeeping.
30 CFR 56.20003(a) · Significant and substantial (S&S) · $5,574.00 proposed penalty
Moving machine parts.
30 CFR 56.14107(a) · $288.00 proposed penalty
Housekeeping.
30 CFR 56.20003(a) · $1,126.00 proposed penalty
Examination of working places.
30 CFR 56.18002(d) · $151.00 proposed penalty
Inspection and cover plates.
30 CFR 56.12032 · $959.00 proposed penalty
Construction and maintenance of ladders.
30 CFR 56.11003 · $288.00 proposed penalty
Guarding electrical connections and resistor grids.
30 CFR 56.12023 · $288.00 proposed penalty
Safe access.
30 CFR 56.11001 · Significant and substantial (S&S) · $1,431.00 proposed penalty
General requirements.
30 CFR 56.4200(b)(2) · $288.00 proposed penalty
Housekeeping.
30 CFR 56.20003(a) · Significant and substantial (S&S) · $5,574.00 proposed penalty
Housekeeping.
30 CFR 56.20003(a) · $1,550.00 proposed penalty
Safe access.
30 CFR 56.11001 · Significant and substantial (S&S) · $165.00 proposed penalty
Safety defects; examination, correction and records.
30 CFR 56.14100(b) · $366.00 proposed penalty
Safety defects; examination, correction and records.
30 CFR 56.14100(a) · $366.00 proposed penalty
Extinguishing equipment.
30 CFR 56.4600(a) · $151.00 proposed penalty
Housekeeping.
30 CFR 56.20003(a) · Significant and substantial (S&S) · $7,676.00 proposed penalty
Housekeeping.
30 CFR 56.20003(a) · $1,550.00 proposed penalty
Housekeeping.
30 CFR 56.20003(a) · $1,550.00 proposed penalty
Correction of dangerous conditions.
30 CFR 56.12030 · Significant and substantial (S&S) · $1,818.00 proposed penalty
Examination of working places.
30 CFR 56.18002(a) · $549.00 proposed penalty
Moving machine parts.
30 CFR 56.14107(a) · $549.00 proposed penalty
Construction and maintenance of guards.
30 CFR 56.14112(a)(1) · $549.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.