← Hoopa Valley Tribe Roads Department

Hoopa Valley Tribe Roads Department safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-28Database snapshot · 2026-10-28

Safety activity

  1. Compliance Follow-up Inspection

    inspectionRecord F042211

    2.3 on-site hours reported

  2. Annual refresher training.

    violationRecord 5102388

    30 CFR 46.8(a)(2) · $2,371.00 proposed penalty

  3. Testing grounding systems.

    violationRecord 5102387

    30 CFR 56.12028 · $245.00 proposed penalty

  4. Preparation and submission of MSHA Form 7000-2—Quarterly Employment and Coal Production Report.

    violationRecord 5102386

    30 CFR 50.30(a) · $151.00 proposed penalty

  5. First-aid materials.

    violationRecord 5102385

    30 CFR 56.15001 · $165.00 proposed penalty

  6. Warning signs.

    violationRecord 5102384

    30 CFR 56.4101 · $151.00 proposed penalty

  7. Brakes.

    violationRecord 5102383

    30 CFR 56.14101(a)(2) · $151.00 proposed penalty

  8. Moving machine parts.

    violationRecord 5102382

    30 CFR 56.14107(a) · $151.00 proposed penalty

  9. Temporary, portable containers.

    violationRecord 5102381

    30 CFR 47.44(b) · $165.00 proposed penalty

  10. Housekeeping.

    violationRecord 5102380

    30 CFR 56.20003(a) · $549.00 proposed penalty

  11. Regular Safety and Health Inspection

    inspectionRecord F02FDC6

    9.5 on-site hours reported

  12. Compliance Follow-up Inspection

    inspectionRecord F02FDA0

    1.5 on-site hours reported

  13. Preparation and submission of MSHA Form 7000-2—Quarterly Employment and Coal Production Report.

    violationRecord 5102346

    30 CFR 50.30(a) · $151.00 proposed penalty

  14. Safety defects; examination, correction and records.

    violationRecord 5102345

    30 CFR 56.14100(b) · $245.00 proposed penalty

  15. Horns and backup alarms.

    violationRecord 5102344

    30 CFR 56.14132(a) · $245.00 proposed penalty

  16. Safety defects; examination, correction and records.

    violationRecord 5102343

    30 CFR 56.14100(a) · $151.00 proposed penalty

  17. Housekeeping.

    violationRecord 5102342

    30 CFR 56.20003(a) · $151.00 proposed penalty

  18. Failure to notify.

    violationRecord 5102341

    30 CFR 41.13 · $151.00 proposed penalty

  19. Regular Safety and Health Inspection

    inspectionRecord F02FD9C

    8.8 on-site hours reported

  20. Compliance Follow-up Inspection

    inspectionRecord F024905

    0.0 on-site hours reported

  21. Regular Safety and Health Inspection

    inspectionRecord F024900

    5.5 on-site hours reported

  22. Construction and maintenance of ladders.

    violationRecord 5102052

    30 CFR 56.11003 · $165.00 proposed penalty

  23. Warning signs.

    violationRecord 5102051

    30 CFR 56.4101 · $165.00 proposed penalty

  24. Housekeeping.

    violationRecord 5102050

    30 CFR 56.20003(a) · Significant and substantial (S&S) · $818.00 proposed penalty

  25. Safety defects; examination, correction and records.

    violationRecord 5102049

    30 CFR 56.14100(b) · $151.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.