HENDERSON OPERATIONS safety activity
MSHA violations, accident reports and inspections.
Safety activity
First aid materials.
30 CFR 57.15001 · $267.00 proposed penalty
Taglines, hitches, and slings.
30 CFR 57.16007(b) · $592.00 proposed penalty
Guarding around lights.
30 CFR 57.12034 · $177.00 proposed penalty
Inspection.
30 CFR 57.4201(a)(2) · $177.00 proposed penalty
Inspection.
30 CFR 57.4201(a)(2) · $177.00 proposed penalty
Combustible waste.
30 CFR 57.4104(b)(2) · $177.00 proposed penalty
Electrical conductors.
30 CFR 57.12004 · $177.00 proposed penalty
Housekeeping.
30 CFR 57.20003(a) · $1,126.00 proposed penalty
Inspection.
30 CFR 57.4201(a)(1) · $398.00 proposed penalty
Controls and switches.
30 CFR 57.12002 · $177.00 proposed penalty
Electrical conductors.
30 CFR 57.12004 · $177.00 proposed penalty
Electrical conductors.
30 CFR 57.12004 · $592.00 proposed penalty
Securing gas cylinders.
30 CFR 57.16005 · $151.00 proposed penalty
Guarding around lights.
30 CFR 57.12034 · $177.00 proposed penalty
Work on electrically-powered equipment.
30 CFR 57.12016 · Significant and substantial (S&S) · $883.00 proposed penalty
Machinery, equipment, and tools.
30 CFR 57.14205 · $592.00 proposed penalty
Inspection.
30 CFR 57.4201(a)(2) · $177.00 proposed penalty
Safe access.
30 CFR 57.11001 · Significant and substantial (S&S) · $818.00 proposed penalty
Testing grounding systems.
30 CFR 57.12028 · $1,037.00 proposed penalty
Berms or guardrails.
30 CFR 57.9300(d)(1) · $151.00 proposed penalty
Safe access.
30 CFR 57.11001 · Significant and substantial (S&S) · $1,219.00 proposed penalty
Berms or guardrails.
30 CFR 57.9300(b) · Significant and substantial (S&S) · $883.00 proposed penalty
Berms or guardrails.
30 CFR 57.9300(d)(1) · $592.00 proposed penalty
Testing grounding systems.
30 CFR 57.12028 · $3,448.00 proposed penalty
Brakes.
30 CFR 57.14101(a)(3) · $151.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.