Henderson County Mine safety activity
MSHA violations, accident reports and inspections.
Safety activity
Maintenance of belt conveyors and belt conveyor entries.
30 CFR 75.1731(a) · $151.00 proposed penalty
Permissible electric face equipment; maintenance.
30 CFR 75.503 · $151.00 proposed penalty
Power wires and cables; insulation and protection.
30 CFR 75.517 · Significant and substantial (S&S) · $697.00 proposed penalty
Belt air course ventilation.
30 CFR 75.350(a)(2) · $193.00 proposed penalty
Power wires and cables; insulation and protection.
30 CFR 75.517 · $151.00 proposed penalty
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · Significant and substantial (S&S) · $1,968.00 proposed penalty
Automatic fire sensor and warning device systems; installation; minimum requirements.
30 CFR 75.1103-4(b) · $193.00 proposed penalty
Belt air course ventilation.
30 CFR 75.350(a)(2) · $193.00 proposed penalty
Regular Safety and Health Inspection
1,298.0 on-site hours reported
Ventilation controls.
30 CFR 75.333(h) · $193.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $151.00 proposed penalty
Roof control plan.
30 CFR 75.220(a)(1) · $209.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $267.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $267.00 proposed penalty
Fire suppression systems for diesel-powered equipment and fuel transportation units.
30 CFR 75.1911(i) · $151.00 proposed penalty
Machinery
No dys awy frm wrk,no rstr act
Accident narrative
Employee was installing a pin in the rib and as they tried to line the steel up with the chuck, their right index finger got caught between the two resulting in a laceration requiring five sutures. They received a full release with no restrictions and returned the same shift.
Roof bolting.
30 CFR 75.204(c)(1) · $151.00 proposed penalty
Power wires and cables; insulation and protection.
30 CFR 75.517 · Significant and substantial (S&S) · $642.00 proposed penalty
Maintenance of diesel-powered equipment.
30 CFR 75.1914(a) · $151.00 proposed penalty
Permissible electric face equipment; maintenance.
30 CFR 75.503 · $151.00 proposed penalty
Condition and examination of firefighting equipment.
30 CFR 75.1100-3 · $151.00 proposed penalty
Electric equipment; examination, testing and maintenance.
30 CFR 75.512 · $151.00 proposed penalty
Condition and examination of firefighting equipment.
30 CFR 75.1100-3 · $151.00 proposed penalty
Roof bolting.
30 CFR 75.204(c)(1) · $193.00 proposed penalty
Methane monitors.
30 CFR 75.342(a)(4) · Significant and substantial (S&S) · $432.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.