← HARD ROCK QUARRY

HARD ROCK QUARRY safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-28Database snapshot · 2026-10-28

Safety activity

  1. Compliance Follow-up Inspection

    inspectionRecord F03E598

    1.0 on-site hours reported

  2. Safety defects; examination, correction and records.

    violationRecord 5075454

    30 CFR 56.14100(b) · $151.00 proposed penalty

  3. Horns and backup alarms.

    violationRecord 5075453

    30 CFR 56.14132(a) · Significant and substantial (S&S) · $398.00 proposed penalty

  4. Safety defects; examination, correction and records.

    violationRecord 5075452

    30 CFR 56.14100(b) · $151.00 proposed penalty

  5. Preparation and submission of MSHA Form 7000-2—Quarterly Employment and Coal Production Report.

    violationRecord 5075451

    30 CFR 50.30(a) · $151.00 proposed penalty

  6. Regular Safety and Health Inspection

    inspectionRecord F03E593

    8.0 on-site hours reported

  7. Compliance Follow-up Inspection

    inspectionRecord F02C744

    1.8 on-site hours reported

  8. Horns and backup alarms.

    violationRecord 5071862

    30 CFR 56.14132(a) · $151.00 proposed penalty

  9. Requirement for container labels.

    violationRecord 5071861

    30 CFR 47.41(a) · $151.00 proposed penalty

  10. Safety defects; examination, correction and records.

    violationRecord 5071860

    30 CFR 56.14100(b) · Significant and substantial (S&S) · $151.00 proposed penalty

  11. Grounding circuit enclosures.

    violationRecord 5071859

    30 CFR 56.12025 · $151.00 proposed penalty

  12. Moving machine parts.

    violationRecord 5071858

    30 CFR 56.14107(a) · $151.00 proposed penalty

  13. Regular Safety and Health Inspection

    inspectionRecord 6926696

    13.0 on-site hours reported

  14. Violation — cited standard not reported

    violationRecord 5073050

    $168.00 proposed penalty

  15. Spot Inspection

    inspectionRecord F021850

    5.5 on-site hours reported

  16. Responsibility for independent contractor training.

    violationRecord 5073044

    30 CFR 46.12(a)(2) · $151.00 proposed penalty

  17. Site-specific hazard awareness training.

    violationRecord 5073043

    30 CFR 46.11(a) · Significant and substantial (S&S) · $504.00 proposed penalty

  18. Moving machine parts.

    violationRecord 5073042

    30 CFR 56.14107(a) · $151.00 proposed penalty

  19. Taglines, hitches, and slings.

    violationRecord 5073041

    30 CFR 56.16007 · Significant and substantial (S&S) · $165.00 proposed penalty

  20. New miner training.

    violationRecord 5073040

    30 CFR 46.5(a) · Significant and substantial (S&S) · $233.00 proposed penalty

  21. Safe access.

    violationRecord 5073039

    30 CFR 56.11001 · Significant and substantial (S&S) · $443.00 proposed penalty

  22. Violation — cited standard not reported

    violationRecord 5073038
  23. Regular Safety and Health Inspection

    inspectionRecord F011E8B

    8.5 on-site hours reported

  24. Inspection.

    violationRecord 5072326

    30 CFR 56.4201(a)(2) · $151.00 proposed penalty

  25. Preparation and submission of MSHA Form 7000-2—Quarterly Employment and Coal Production Report.

    violationRecord 5072325

    30 CFR 50.30(a) · $151.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.