← Hannibal Underground

Hannibal Underground safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Spot Inspection

    inspectionRecord F011872

    9.0 on-site hours reported

  2. Compliance Follow-up Inspection

    inspectionRecord F007B6C

    11.0 on-site hours reported

  3. Moving machine parts.

    violationRecord 9788390

    30 CFR 57.14107(a)

  4. Illumination of surface working areas.

    violationRecord 9788801

    30 CFR 57.17001 · $193.00 proposed penalty

  5. Verbal Hazard Complaint Inspections

    inspectionRecord F007B6B

    6.0 on-site hours reported

  6. Handling of materials

    accidentRecord 220252370022

    No dys awy frm wrk,no rstr act

    Accident narrative

    Employee was attempting to lift elevator door on man elevator and door stuck which caused EE to strain EE's back. Was still working at full duty, became a recordable on August 20, 2025. Prescribed medications and also limitations. Able to work with limitations.

  7. Parking procedures for unattended equipment.

    violationRecord 9782000

    30 CFR 57.14207 · $151.00 proposed penalty

  8. Unguarded conveyors with adjacent travelways.

    violationRecord 9781999

    30 CFR 57.14109(a) · $193.00 proposed penalty

  9. Spillage and leakage.

    violationRecord 9788385

    30 CFR 57.4102 · $336.00 proposed penalty

  10. Safe access.

    violationRecord 9788384

    30 CFR 57.11001 · $193.00 proposed penalty

  11. Inspection and cover plates.

    violationRecord 9788383

    30 CFR 57.12032 · $193.00 proposed penalty

  12. Illumination of surface working areas.

    violationRecord 9781998

    30 CFR 57.17001 · $193.00 proposed penalty

  13. Identification of power switches.

    violationRecord 9781997

    30 CFR 57.12018 · $193.00 proposed penalty

  14. Safe access.

    violationRecord 9781996

    30 CFR 57.11001 · $193.00 proposed penalty

  15. Illumination of surface working areas.

    violationRecord 9788382

    30 CFR 57.17001 · $193.00 proposed penalty

  16. Housekeeping.

    violationRecord 9788381

    30 CFR 57.20003(a) · $755.00 proposed penalty

  17. Safe access.

    violationRecord 9788380

    30 CFR 57.11001 · $193.00 proposed penalty

  18. Handrails and toeboards.

    violationRecord 9788379

    30 CFR 57.11002 · $193.00 proposed penalty

  19. Housekeeping.

    violationRecord 9788378

    30 CFR 57.20003(a) · $755.00 proposed penalty

  20. Preparation and submission of MSHA Form 7000-2—Quarterly Employment and Coal Production Report.

    violationRecord 9781995

    30 CFR 50.30(a) · $151.00 proposed penalty

  21. Safe access.

    violationRecord 9788377

    30 CFR 57.11001 · Significant and substantial (S&S) · $1,126.00 proposed penalty

  22. Moving machine parts.

    violationRecord 9788376

    30 CFR 57.14107(a) · $755.00 proposed penalty

  23. Moving machine parts.

    violationRecord 9788375

    30 CFR 57.14107(a) · $839.00 proposed penalty

  24. Testing grounding systems.

    violationRecord 9788374

    30 CFR 57.12028 · $151.00 proposed penalty

  25. Operators' stations.

    violationRecord 9781994

    30 CFR 57.14103(a) · $549.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.