← Hall Quarry

Hall Quarry safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-28Database snapshot · 2026-10-28

Safety activity

  1. Compliance Follow-up Inspection

    inspectionRecord F03E209

    1.0 on-site hours reported

  2. Regular Safety and Health Inspection

    inspectionRecord F03E205

    11.3 on-site hours reported

  3. Safety defects; examination, correction and records.

    violationRecord 5089521

    30 CFR 56.14100(b) · $151.00 proposed penalty

  4. Examination of working places.

    violationRecord 5089520

    30 CFR 56.18002(a) · Significant and substantial (S&S) · $480.00 proposed penalty

  5. Pit or quarry wall perimeter.

    violationRecord 5089519

    30 CFR 56.3131 · Significant and substantial (S&S) · $443.00 proposed penalty

  6. Violation — cited standard not reported

    violationRecord 5089518
  7. Regular Safety and Health Inspection

    inspectionRecord F026AC8

    4.0 on-site hours reported

  8. Regular Safety and Health Inspection

    inspectionRecord F0157FC

    2.8 on-site hours reported

  9. Eye protection.

    violationRecord 9774548

    30 CFR 56.15004 · Significant and substantial (S&S) · $177.00 proposed penalty

  10. Regular Safety and Health Inspection

    inspectionRecord F00E20C

    11.0 on-site hours reported

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.