← Haile Gold Mine

Haile Gold Mine safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Safety defects; examination, correction and records.

    violationRecord 5066134

    30 CFR 57.14100(b) · $288.00 proposed penalty

  2. Safe access.

    violationRecord 5065794

    30 CFR 57.11001 · $151.00 proposed penalty

  3. Berms or guardrails.

    violationRecord 5063652

    30 CFR 57.9300(d)(3) · $465.00 proposed penalty

  4. Safety procedures for towing.

    violationRecord 5063651

    30 CFR 57.14209(b) · $151.00 proposed penalty

  5. Spillage and leakage.

    violationRecord 5063287

    30 CFR 57.4102 · $151.00 proposed penalty

  6. Safety defects; examination, correction and records.

    violationRecord 5063286

    30 CFR 57.14100(b) · $288.00 proposed penalty

  7. Safety defects; examination, correction and records.

    violationRecord 5066133

    30 CFR 57.14100(b) · $288.00 proposed penalty

  8. Brakes.

    violationRecord 5066132

    30 CFR 57.14101(a)(2) · $209.00 proposed penalty

  9. Safety defects; examination, correction and records.

    violationRecord 5066131

    30 CFR 57.14100(b) · $288.00 proposed penalty

  10. Inspection and cover plates.

    violationRecord 5066130

    30 CFR 57.12032 · $209.00 proposed penalty

  11. Examination of working places.

    violationRecord 5065793

    30 CFR 57.18002 · Significant and substantial (S&S) · $8,315.00 proposed penalty

  12. Securing movable parts.

    violationRecord 5065792

    30 CFR 57.14206(b) · $209.00 proposed penalty

  13. Construction and maintenance of guards.

    violationRecord 5063650

    30 CFR 57.14112(b) · $193.00 proposed penalty

  14. Construction and maintenance of guards.

    violationRecord 5063649

    30 CFR 57.14112(a)(1) · $151.00 proposed penalty

  15. Safety defects; examination, correction and records.

    violationRecord 5063285

    30 CFR 57.14100(b) · $288.00 proposed penalty

  16. Slip or fall of person

    accidentRecord 220260620004

    Days restricted activity only

    Accident narrative

    Employee twisted ankle when walking on ground while performing maintenance activities on an excavator.

  17. Regular Safety and Health Inspection

    inspectionRecord F0280EF

    192.0 on-site hours reported

  18. 103 (g) Written Notification Hazard Complaint Inspectio

    inspectionRecord F02CAC4

    2.5 on-site hours reported

  19. Barricades and warning signs.

    violationRecord 5065791

    30 CFR 57.20011 · $151.00 proposed penalty

  20. General requirements.

    violationRecord 5065788

    30 CFR 57.4200(a)(2) · $151.00 proposed penalty

  21. Safe access.

    violationRecord 5065787

    30 CFR 57.11001 · $151.00 proposed penalty

  22. Correction of dangerous conditions.

    violationRecord 5065786

    30 CFR 57.12030 · Significant and substantial (S&S) · $2,312.00 proposed penalty

  23. Construction and maintenance of guards.

    violationRecord 5063648

    30 CFR 57.14112(b) · $193.00 proposed penalty

  24. Construction and maintenance of guards.

    violationRecord 5063647

    30 CFR 57.14112(a)(1) · $151.00 proposed penalty

  25. Insulation and fittings for power wires and cables.

    violationRecord 5063284

    30 CFR 57.12008 · $151.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.