← Greer Limestone

Greer Limestone safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-28Database snapshot · 2026-10-28

Safety activity

  1. Securing gas cylinders.

    violationRecord 9589212

    30 CFR 56.16005 · $151.00 proposed penalty

  2. Safe access.

    violationRecord 9589211

    30 CFR 56.11001 · $151.00 proposed penalty

  3. Machinery

    accidentRecord 220250290035

    No dys awy frm wrk,no rstr act

    Accident narrative

    EE was scaling the right rib with a CAT Excavator in 42 Face when a rock from the face fell and hit the FOPS of the machine and broke through the left rear glass and ended up on the seat behind EE. EE claims that EE does not believe the rock hit EE. However EE did have lower back pain before exiting the machine.

  4. Escape routes.

    violationRecord 9589210

    30 CFR 57.11051(a) · Significant and substantial (S&S) · $697.00 proposed penalty

  5. Safe access.

    violationRecord 9589206

    30 CFR 57.11001 · $151.00 proposed penalty

  6. Regular Safety and Health Inspection

    inspectionRecord F00525E

    53.5 on-site hours reported

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.