Greer Limestone safety activity
MSHA violations, accident reports and inspections.
Safety activity
Spot Inspection
1.5 on-site hours reported
Flying or falling materials.
30 CFR 57.14110
Operating speeds and control of equipment.
30 CFR 57.9101 · $432.00 proposed penalty
Magazine requirements.
30 CFR 57.6132(a)(4) · $151.00 proposed penalty
Safety defects; examination, correction and records.
30 CFR 57.14100(b) · $151.00 proposed penalty
Correction of hazardous conditions.
30 CFR 57.3200 · Significant and substantial (S&S) · $151.00 proposed penalty
Regular Safety and Health Inspection
54.0 on-site hours reported
Safety defects; examination, correction and records.
30 CFR 57.14100(d) · $151.00 proposed penalty
Safety defects; examination, correction and records.
30 CFR 57.14100(a) · $151.00 proposed penalty
Safety defects; examination, correction and records.
30 CFR 57.14100(b) · $151.00 proposed penalty
Safety defects; examination, correction and records.
30 CFR 57.14100(b) · $151.00 proposed penalty
Handtools (nonpowered)
No dys awy frm wrk,no rstr act
Accident narrative
EE was making a V cut in belt with a utility knife to keep damaged splices from catching and further damaging the belt. During the finish cut they placed a hand in a poor position and the knife plunged through and cut their left hand ring finger tip. EE was not wearing gloves.
Spot Inspection
5.8 on-site hours reported
Spot Inspection
8.5 on-site hours reported
Safety defects; examination, correction and records.
30 CFR 57.14100(c) · $151.00 proposed penalty
Handling of materials
Perm tot or perm prtl disablty
Accident narrative
Employee claims EE leaned across the bottom drill to fuel it and felt a pop in EE's stomach. EE said EE thought EE had pulled a muscle. EE did not properly report it to management. EE went to the doctors on EE's own volition. EE admitted to being seen prior to our employ for stomach issues. We question this claim and are actively investigating it.
Regular Safety and Health Inspection
55.3 on-site hours reported
Safety defects; examination, correction and records.
30 CFR 57.14100(b) · $151.00 proposed penalty
Safety defects; examination, correction and records.
30 CFR 57.14100(b) · $151.00 proposed penalty
Regular Safety and Health Inspection
60.0 on-site hours reported
Insulation and fittings for power wires and cables.
30 CFR 56.12008 · $151.00 proposed penalty
Horns and backup alarms for surface equipment.
30 CFR 57.14132(b)(1)(i) · $151.00 proposed penalty
Brakes.
30 CFR 57.14101(a)(3) · $151.00 proposed penalty
Electrical conductors.
30 CFR 57.12004 · $151.00 proposed penalty
Moving machine parts.
30 CFR 57.14107(a) · $151.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.