  1. Fixed ladder anchorage and toe clearance.

    violationRecord 9791715

    30 CFR 57.11005 · $313.00 proposed penalty

  2. General requirements.

    violationRecord 9791714

    30 CFR 57.4200(b)(2) · $151.00 proposed penalty

  3. Inspection and cover plates.

    violationRecord 9797770

    30 CFR 57.12032 · $1,219.00 proposed penalty

  4. Inspection and cover plates.

    violationRecord 9797769

    30 CFR 57.12032 · $1,219.00 proposed penalty

  5. Housekeeping.

    violationRecord 9797768

    30 CFR 57.20003(a) · Significant and substantial (S&S) · $1,037.00 proposed penalty

  6. Stationary grinding machines.

    violationRecord 9797767

    30 CFR 57.14115(b) · $209.00 proposed penalty

  7. First aid materials.

    violationRecord 5005410

    30 CFR 57.15001 · $313.00 proposed penalty

  8. Danger signs.

    violationRecord 5005409

    30 CFR 57.12021 · $151.00 proposed penalty

  9. Correction of hazardous conditions.

    violationRecord 5005408

    30 CFR 57.3200 · Significant and substantial (S&S) · $1,037.00 proposed penalty

  10. Correction of hazardous conditions.

    violationRecord 5005407

    30 CFR 57.3200 · Significant and substantial (S&S) · $1,037.00 proposed penalty

  11. Correction of hazardous conditions.

    violationRecord 5005406

    30 CFR 57.3200 · $313.00 proposed penalty

  12. Regular Safety and Health Inspection

    inspectionRecord F002D20

    24.3 on-site hours reported

  13. Special Emphasis Programs

    inspectionRecord F01BD81

    2.0 on-site hours reported

  14. Locking transformer enclosures.

    violationRecord 9795711

    30 CFR 57.12068 · $267.00 proposed penalty

  15. Gauges and regulators.

    violationRecord 9795710

    30 CFR 57.4602 · $151.00 proposed penalty

  16. Identification of power switches.

    violationRecord 9795709

    30 CFR 57.12018 · $177.00 proposed penalty

  17. Safety defects; examination, correction and records.

    violationRecord 5004071

    30 CFR 57.14100(b) · Significant and substantial (S&S) · $1,320.00 proposed penalty

  18. Construction and maintenance of guards.

    violationRecord 5004070

    30 CFR 57.14112(b) · Significant and substantial (S&S) · $1,320.00 proposed penalty

  19. Parking procedures for unattended equipment.

    violationRecord 5004069

    30 CFR 57.14207 · $177.00 proposed penalty

  20. Safety defects; examination, correction and records.

    violationRecord 5002923

    30 CFR 57.14100(b) · $267.00 proposed penalty

  21. Controls and switches.

    violationRecord 5002922

    30 CFR 57.12002 · $177.00 proposed penalty

  22. Requirement for container labels.

    violationRecord 5002921

    30 CFR 47.41(a) · $177.00 proposed penalty

  23. Construction and maintenance of guards.

    violationRecord 9795708

    30 CFR 57.14112(a)(1) · $177.00 proposed penalty

  24. Temporary, portable containers.

    violationRecord 5004068

    30 CFR 47.44(b) · $177.00 proposed penalty

  25. Construction and maintenance of guards.

    violationRecord 5004067

    30 CFR 57.14112(b) · $267.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.