← Gramercy Operation

Gramercy Operation safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Housekeeping.

    violationRecord 5174670

    30 CFR 56.20003(c) · Significant and substantial (S&S) · $1,467.00 proposed penalty

  2. Housekeeping.

    violationRecord 5174669

    30 CFR 56.20003(c) · $267.00 proposed penalty

  3. Housekeeping.

    violationRecord 5174668

    30 CFR 56.20003(c) · Significant and substantial (S&S) · $1,467.00 proposed penalty

  4. Housekeeping.

    violationRecord 5174667

    30 CFR 56.20003(c) · Significant and substantial (S&S) · $1,467.00 proposed penalty

  5. Safe access.

    violationRecord 5174666

    30 CFR 56.11001 · $465.00 proposed penalty

  6. High-pressure hose connections.

    violationRecord 5174665

    30 CFR 56.13021 · $432.00 proposed penalty

  7. Inspection and cover plates.

    violationRecord 5174418

    30 CFR 56.12032 · $1,968.00 proposed penalty

  8. Electrical conductors.

    violationRecord 5174417

    30 CFR 56.12004 · $1,431.00 proposed penalty

  9. Housekeeping.

    violationRecord 5009398

    30 CFR 56.20003(b) · Significant and substantial (S&S) · $5,277.00 proposed penalty

  10. Requirement for container labels.

    violationRecord 5009397

    30 CFR 47.41(a) · $151.00 proposed penalty

  11. Construction and maintenance of guards.

    violationRecord 5009396

    30 CFR 56.14112(a)(1) · $398.00 proposed penalty

  12. Housekeeping.

    violationRecord 5009395

    30 CFR 56.20003(a) · $883.00 proposed penalty

  13. Correction of dangerous conditions.

    violationRecord 5009394

    30 CFR 56.12030 · $267.00 proposed penalty

  14. Housekeeping.

    violationRecord 5009393

    30 CFR 56.20003(b) · Significant and substantial (S&S) · $3,538.00 proposed penalty

  15. General requirements.

    violationRecord 5009392

    30 CFR 56.4200(b)(1) · $151.00 proposed penalty

  16. Housekeeping.

    violationRecord 5009391

    30 CFR 56.20003(b) · Significant and substantial (S&S) · $3,538.00 proposed penalty

  17. Barricades and warning signs.

    violationRecord 5174416

    30 CFR 56.20011 · $267.00 proposed penalty

  18. Barricades and warning signs.

    violationRecord 5174415

    30 CFR 56.20011 · $267.00 proposed penalty

  19. Barricades and warning signs.

    violationRecord 5174414

    30 CFR 56.20011 · $267.00 proposed penalty

  20. Exits.

    violationRecord 5009390

    30 CFR 56.4530 · Significant and substantial (S&S) · $1,467.00 proposed penalty

  21. Warning signs.

    violationRecord 5009389

    30 CFR 56.4101 · $267.00 proposed penalty

  22. Inspection.

    violationRecord 5009388

    30 CFR 56.4201(a)(2) · $267.00 proposed penalty

  23. Slip or fall of person

    accidentRecord 220261900033

    Days restricted activity only

    Accident narrative

    Employee was monitoring work on a drain located 20 feet away from the valve when an unexpected blowout occurred. The force of the blowout propelled caustic material in the employee's direction, resulting in a slip and subsequent fall.

  24. Housekeeping.

    violationRecord 5178230

    30 CFR 56.20003(a) · $642.00 proposed penalty

  25. Construction and maintenance of ladders.

    violationRecord 5178229

    30 CFR 56.11003 · $226.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.