Goldrush safety activity
MSHA violations, accident reports and inspections.
Safety activity
Auxiliary fan systems.
30 CFR 57.8529 · Significant and substantial (S&S)
Construction and maintenance of ventilation doors.
30 CFR 57.8531(c)
Auxiliary fan systems.
30 CFR 57.8529
Auxiliary fan systems.
30 CFR 57.8529 · Significant and substantial (S&S)
Ventilation Technical Investigation
8.8 on-site hours reported
Handling of materials
Days away from work only
Accident narrative
Ee was using an 8 inch water hose. The hose dropped from about 3 feet, landing directly on the ee's right foot. Seen at ER, diagnosed with a contusion to the right foot, and releasd with a brace and crutches. On follow-up, ee continued on restricted duty with brace and crutches. Follow-up again on 9/28.
Slip or fall of person
Days away from work only
Accident narrative
Ee exiting bus at end of shift. EE stepped into/onto a ditch and rolled EE's ankle. Seen at clinic 9/4 which was EE's Friday, given brace and crutches. On follow-up 9/9, unable to bear weight, given a scooter and released with restrictions. Site cannot offer modified duty.
Verbal Hazard Complaint Inspections
7.0 on-site hours reported
Safety defects; examination, correction and records.
30 CFR 57.14100(c)
Compliance Follow-up Inspection
7.0 on-site hours reported
Compliance Follow-up Inspection
6.5 on-site hours reported
Verbal Hazard Complaint Inspections
3.0 on-site hours reported
Ground support use.
30 CFR 57.3360 · Significant and substantial (S&S) · $3,736.00 proposed penalty
Ground support use.
30 CFR 57.3360 · $504.00 proposed penalty
Main facilities.
30 CFR 57.6160 · $193.00 proposed penalty
Refuge areas.
30 CFR 57.11052(d) · $642.00 proposed penalty
Separation of transported explosive material.
30 CFR 57.6201(b)(2) · $151.00 proposed penalty
Underground shops.
30 CFR 57.4761 · $193.00 proposed penalty
Oxygen cylinder storage.
30 CFR 57.4601 · $193.00 proposed penalty
Testing grounding systems.
30 CFR 57.12028 · $193.00 proposed penalty
Safe access.
30 CFR 57.11001 · $193.00 proposed penalty
Toilet facilities.
30 CFR 57.20008(b) · $193.00 proposed penalty
Ground support use.
30 CFR 57.3360 · Significant and substantial (S&S) · $44,613.00 proposed penalty
Fall of roof or back
No dys awy frm wrk,no rstr act
Accident narrative
EE was doing heading inspection when a rock fell from the back, striking them on ther hard hat. Seen at hospital and followed-up at clinic, diagnosed with neck/back injury. Released with restrictions. EE resigned effective 7/30 after taking PTO for 2 days rather than returning to work under restrictions.
Separation of transported explosive material.
30 CFR 57.6201(b)(1) · $642.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.