← Gold Road Mine

Gold Road Mine safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Spillage and leakage.

    violationRecord 5103285

    30 CFR 57.4102 · $151.00 proposed penalty

  2. Circuit overload protection.

    violationRecord 5103284

    30 CFR 57.12001 · $151.00 proposed penalty

  3. Regular Safety and Health Inspection

    inspectionRecord F023EF6

    45.3 on-site hours reported

  4. High-pressure hose connections.

    violationRecord 5103915

    30 CFR 57.13021 · $151.00 proposed penalty

  5. High-pressure hose connections.

    violationRecord 5103283

    30 CFR 57.13021 · $151.00 proposed penalty

  6. Parking procedures for unattended equipment.

    violationRecord 5103074

    30 CFR 57.14207 · $151.00 proposed penalty

  7. Horns and backup alarms for surface equipment.

    violationRecord 5103072

    30 CFR 57.14132(a) · $151.00 proposed penalty

  8. Access to stationary electrical equipment or switchgear.

    violationRecord 5103071

    30 CFR 57.12019 · $151.00 proposed penalty

  9. Construction and maintenance of guards.

    violationRecord 5103073

    30 CFR 57.14112(b) · $151.00 proposed penalty

  10. Independent contractor register.

    violationRecord 5103070

    30 CFR 45.4(b) · $151.00 proposed penalty

  11. Portable rigid ladders.

    violationRecord 5103069

    30 CFR 57.11004 · $151.00 proposed penalty

  12. Unguarded conveyors with adjacent travelways.

    violationRecord 5103068

    30 CFR 57.14109(b) · $151.00 proposed penalty

  13. Testing grounding systems.

    violationRecord 5103067

    30 CFR 57.12028 · $267.00 proposed penalty

  14. Regular Safety and Health Inspection

    inspectionRecord F023EE5

    26.0 on-site hours reported

  15. Training plans; time of submission; where filed; information required; time for approval; method for disapproval; commencement of training; approval of instructors.

    violationRecord 9686992

    30 CFR 48.23(h)(1) · $288.00 proposed penalty

  16. Training plans; time of submission; where filed; information required; time for approval; method for disapproval; commencement of training; approval of instructors.

    violationRecord 9686991

    30 CFR 48.23(c)(3) · $151.00 proposed penalty

  17. Training of new miners; minimum courses of instruction; hours of instruction.

    violationRecord 9686990

    30 CFR 48.25(a) · $168.00 proposed penalty

  18. Experienced miner training.

    violationRecord 9686989

    30 CFR 48.26(a) · $233.00 proposed penalty

  19. Testing grounding systems.

    violationRecord 9686988

    30 CFR 56.12028 · $151.00 proposed penalty

  20. 103 (g) Written Notification Hazard Complaint Inspectio

    inspectionRecord F021E67

    12.0 on-site hours reported

  21. Spillage and leakage.

    violationRecord 9680200

    30 CFR 57.4102 · $151.00 proposed penalty

  22. Testing grounding systems.

    violationRecord 5103202

    30 CFR 57.12028 · $151.00 proposed penalty

  23. Insulation and fittings for power wires and cables.

    violationRecord 5103201

    30 CFR 57.12008 · $151.00 proposed penalty

  24. Independent contractor register.

    violationRecord 5103016

    30 CFR 45.4(b) · $151.00 proposed penalty

  25. Records of training.

    violationRecord 5103015

    30 CFR 48.9(a) · $151.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.