← GMcB Lincoln Pits & Mill

GMcB Lincoln Pits & Mill safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-28Database snapshot · 2026-10-28

Safety activity

  1. Protection for openings around travelways.

    violationRecord 5100965

    30 CFR 56.11012 · $697.00 proposed penalty

  2. Inspection and cover plates.

    violationRecord 5100964

    30 CFR 56.12032 · $697.00 proposed penalty

  3. Inspection and cover plates.

    violationRecord 5100963

    30 CFR 56.12032 · $697.00 proposed penalty

  4. Construction and maintenance of guards.

    violationRecord 5100962

    30 CFR 56.14112(a)(1) · $313.00 proposed penalty

  5. Insulation and fittings for power wires and cables.

    violationRecord 5100961

    30 CFR 56.12008 · $697.00 proposed penalty

  6. Guarding around lights.

    violationRecord 5100960

    30 CFR 56.12034 · $209.00 proposed penalty

  7. Electrical conductors.

    violationRecord 5100959

    30 CFR 56.12004 · $697.00 proposed penalty

  8. Construction and maintenance of guards.

    violationRecord 5100958

    30 CFR 56.14112(a)(1) · $313.00 proposed penalty

  9. Regular Safety and Health Inspection

    inspectionRecord F034D56

    9.8 on-site hours reported

  10. Compliance Follow-up Inspection

    inspectionRecord F02C68B

    1.0 on-site hours reported

  11. Regular Safety and Health Inspection

    inspectionRecord F025DAC

    16.8 on-site hours reported

  12. Moving machine parts.

    violationRecord 5102933

    30 CFR 56.14107(a) · Significant and substantial (S&S) · $1,431.00 proposed penalty

  13. Illumination of surface working areas.

    violationRecord 5102932

    30 CFR 56.17001 · Significant and substantial (S&S) · $151.00 proposed penalty

  14. Electrical conductors.

    violationRecord 5102931

    30 CFR 56.12004 · $151.00 proposed penalty

  15. Housekeeping.

    violationRecord 5102930

    30 CFR 56.20003(a) · Significant and substantial (S&S) · $151.00 proposed penalty

  16. Moving machine parts.

    violationRecord 5102929

    30 CFR 56.14107(a) · Significant and substantial (S&S) · $1,431.00 proposed penalty

  17. Moving machine parts.

    violationRecord 5102928

    30 CFR 56.14107(a) · Significant and substantial (S&S) · $642.00 proposed penalty

  18. Moving machine parts.

    violationRecord 5102927

    30 CFR 56.14107(a) · $151.00 proposed penalty

  19. Scaffolds and working platforms.

    violationRecord 5102926

    30 CFR 56.11027 · $151.00 proposed penalty

  20. Safety defects; examination, correction and records.

    violationRecord 5102925

    30 CFR 56.14100(c) · $151.00 proposed penalty

  21. Moving machine parts.

    violationRecord 5102924

    30 CFR 56.14107(a) · Significant and substantial (S&S) · $193.00 proposed penalty

  22. Brakes.

    violationRecord 5102923

    30 CFR 56.14101(a)(2) · $151.00 proposed penalty

  23. Housekeeping.

    violationRecord 5102922

    30 CFR 56.20003(c) · $151.00 proposed penalty

  24. Safety defects; examination, correction and records.

    violationRecord 5102101

    30 CFR 56.14100(b) · $151.00 proposed penalty

  25. Housekeeping.

    violationRecord 9689202

    30 CFR 56.20003(a) · $151.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.