Glen Mills safety activity
MSHA violations, accident reports and inspections.
Safety activity
Construction and maintenance of guards.
30 CFR 56.14112(a)(1) · $592.00 proposed penalty
Construction and maintenance of guards.
30 CFR 56.14112(a)(1) · $592.00 proposed penalty
Housekeeping.
30 CFR 56.20003(a) · $1,126.00 proposed penalty
Unguarded conveyors with adjacent travelways.
30 CFR 56.14109(b)(2) · $592.00 proposed penalty
Electrical conductors.
30 CFR 56.12004 · $4,383.00 proposed penalty
Requirement for container labels.
30 CFR 47.41(a) · $398.00 proposed penalty
Horns and backup alarms.
30 CFR 56.14132(a) · Significant and substantial (S&S) · $6,540.00 proposed penalty
Electrical conductors.
30 CFR 56.12004 · $1,320.00 proposed penalty
Regular Safety and Health Inspection
48.5 on-site hours reported
Machinery
Days away from work only
Accident narrative
Worker was positioning 10-inch plastic pipe into a 412 Fusion machine to be fused to another piece of pipe. On doing so, EE pinched EE's left pinky finger between the pipe causing a fracture to EE's knuckle.
Other
Injuries due to natural causes
Accident narrative
Employee experiencing lower back pain after operating the Pit loader.
Compliance Follow-up Inspection
2.0 on-site hours reported
Closure of valves.
30 CFR 56.4603(b) · $209.00 proposed penalty
Horns and backup alarms.
30 CFR 56.14132(b) · $818.00 proposed penalty
Construction and maintenance of guards.
30 CFR 56.14112(a) · Significant and substantial (S&S) · $1,818.00 proposed penalty
Housekeeping.
30 CFR 56.20003(a) · Significant and substantial (S&S) · $3,184.00 proposed penalty
Access to stationary electrical equipment or switchgear.
30 CFR 56.12019 · $245.00 proposed penalty
Housekeeping.
30 CFR 56.20003(a) · Significant and substantial (S&S) · $3,184.00 proposed penalty
Housekeeping.
30 CFR 56.20003(a) · Significant and substantial (S&S) · $3,184.00 proposed penalty
Construction and maintenance of guards.
30 CFR 56.14112(a) · $366.00 proposed penalty
Inspection and cover plates.
30 CFR 56.12032 · $818.00 proposed penalty
Safe access.
30 CFR 56.11001 · Significant and substantial (S&S) · $4,047.00 proposed penalty
Handrails and toeboards.
30 CFR 56.11002 · $245.00 proposed penalty
Parking procedures for unattended equipment.
30 CFR 56.14207 · $245.00 proposed penalty
Protection of gas cylinder valves.
30 CFR 56.16006 · $818.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.