Permissible electric face equipment; maintenance.
30 CFR 75.503 · $151.00 proposed penalty
Inspection of fire suppression devices.
30 CFR 75.1107-16(b) · $193.00 proposed penalty
Power wires and cables; insulation and protection.
30 CFR 75.517 · Significant and substantial (S&S) · $959.00 proposed penalty
Power wires and cables; insulation and protection.
30 CFR 75.517 · Significant and substantial (S&S) · $959.00 proposed penalty
Condition and examination of firefighting equipment.
30 CFR 75.1100-3 · $193.00 proposed penalty
Permissible electric face equipment; maintenance.
30 CFR 75.503 · $151.00 proposed penalty
Roof control plan.
30 CFR 75.220(a)(1) · $193.00 proposed penalty
Power wires and cables; insulation and protection.
30 CFR 75.517 · Significant and substantial (S&S) · $959.00 proposed penalty
Permissible electric face equipment; maintenance.
30 CFR 75.503 · $288.00 proposed penalty
Drill dust control at underground areas of underground mines.
30 CFR 72.630(b) · $226.00 proposed penalty
Criteria—Haulage; general.
30 CFR 75.1403-10(b) · Significant and substantial (S&S) · $1,126.00 proposed penalty
Emergency tethers.
30 CFR 75.1714-6 · $245.00 proposed penalty
Preshift examination at fixed intervals.
30 CFR 75.360(f) · $151.00 proposed penalty
Regular Safety and Health Inspection
224.5 on-site hours reported
Spot Inspection
3.5 on-site hours reported
Power wires and cables; insulation and protection.
30 CFR 75.517 · $151.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $151.00 proposed penalty
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · $151.00 proposed penalty
Clamping of trailing cables to equipment.
30 CFR 75.605 · $151.00 proposed penalty
Permissible electric face equipment; maintenance.
30 CFR 75.503 · $151.00 proposed penalty
Condition and examination of firefighting equipment.
30 CFR 75.1100-3 · $151.00 proposed penalty
Condition and examination of firefighting equipment.
30 CFR 75.1100-3 · $151.00 proposed penalty
Machinery
No dys awy frm wrk,no rstr act
Accident narrative
EE was leveling EE's drill pot and EE's left middle and ring fingers were mashed between the adjustment rods and a nut on the inside of the drill boom causing a laceration requiring 2 stitches to the ring finger and tuft fractures to each finger tip.
Exploding vessels under pressure
Days away from work only
Accident narrative
While EE was removing the inner cap to change a conveyor torque shaft, oil, under pressure, came out of the conveyor pot and covered EE's arms, hands and a few places on EE's face. This caused burns and blistering.
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · $755.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.