  1. Permissible electric face equipment; maintenance.

    violationRecord 5021081

    30 CFR 75.503 · $151.00 proposed penalty

  2. Inspection of fire suppression devices.

    violationRecord 5021080

    30 CFR 75.1107-16(b) · $193.00 proposed penalty

  3. Power wires and cables; insulation and protection.

    violationRecord 5021079

    30 CFR 75.517 · Significant and substantial (S&S) · $959.00 proposed penalty

  4. Power wires and cables; insulation and protection.

    violationRecord 5021078

    30 CFR 75.517 · Significant and substantial (S&S) · $959.00 proposed penalty

  5. Condition and examination of firefighting equipment.

    violationRecord 5021077

    30 CFR 75.1100-3 · $193.00 proposed penalty

  6. Permissible electric face equipment; maintenance.

    violationRecord 5021076

    30 CFR 75.503 · $151.00 proposed penalty

  7. Roof control plan.

    violationRecord 5021075

    30 CFR 75.220(a)(1) · $193.00 proposed penalty

  8. Power wires and cables; insulation and protection.

    violationRecord 5021074

    30 CFR 75.517 · Significant and substantial (S&S) · $959.00 proposed penalty

  9. Permissible electric face equipment; maintenance.

    violationRecord 5021073

    30 CFR 75.503 · $288.00 proposed penalty

  10. Drill dust control at underground areas of underground mines.

    violationRecord 5021068

    30 CFR 72.630(b) · $226.00 proposed penalty

  11. Criteria—Haulage; general.

    violationRecord 5022028

    30 CFR 75.1403-10(b) · Significant and substantial (S&S) · $1,126.00 proposed penalty

  12. Emergency tethers.

    violationRecord 5021067

    30 CFR 75.1714-6 · $245.00 proposed penalty

  13. Preshift examination at fixed intervals.

    violationRecord 5021066

    30 CFR 75.360(f) · $151.00 proposed penalty

  14. Regular Safety and Health Inspection

    inspectionRecord 6322589

    224.5 on-site hours reported

  15. Spot Inspection

    inspectionRecord F008735

    3.5 on-site hours reported

  16. Power wires and cables; insulation and protection.

    violationRecord 5025426

    30 CFR 75.517 · $151.00 proposed penalty

  17. Accumulation of combustible materials.

    violationRecord 5025425

    30 CFR 75.400 · $151.00 proposed penalty

  18. Mine ventilation plan; submission and approval.

    violationRecord 5025424

    30 CFR 75.370(a)(1) · $151.00 proposed penalty

  19. Clamping of trailing cables to equipment.

    violationRecord 5025423

    30 CFR 75.605 · $151.00 proposed penalty

  20. Permissible electric face equipment; maintenance.

    violationRecord 9599911

    30 CFR 75.503 · $151.00 proposed penalty

  21. Condition and examination of firefighting equipment.

    violationRecord 5025422

    30 CFR 75.1100-3 · $151.00 proposed penalty

  22. Condition and examination of firefighting equipment.

    violationRecord 5025421

    30 CFR 75.1100-3 · $151.00 proposed penalty

  23. Machinery

    accidentRecord 220252320008

    No dys awy frm wrk,no rstr act

    Accident narrative

    EE was leveling EE's drill pot and EE's left middle and ring fingers were mashed between the adjustment rods and a nut on the inside of the drill boom causing a laceration requiring 2 stitches to the ring finger and tuft fractures to each finger tip.

  24. Exploding vessels under pressure

    accidentRecord 220252320015

    Days away from work only

    Accident narrative

    While EE was removing the inner cap to change a conveyor torque shaft, oil, under pressure, came out of the conveyor pot and covered EE's arms, hands and a few places on EE's face. This caused burns and blistering.

  25. Mine ventilation plan; submission and approval.

    violationRecord 9843040

    30 CFR 75.370(a)(1) · $755.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.