Glen Alum Tunnel Mine safety activity
MSHA violations, accident reports and inspections.
Safety activity
Preshift examination at fixed intervals.
30 CFR 75.360(b)(4) · $151.00 proposed penalty
Escapeways; bituminous and lignite mines.
30 CFR 75.380(d)(7)(vii)(A) · $642.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $151.00 proposed penalty
Regular Safety and Health Inspection
208.5 on-site hours reported
Roof control plan.
30 CFR 75.220(a)(1) · $818.00 proposed penalty
Ventilation controls.
30 CFR 75.333(d)(3) · $151.00 proposed penalty
Power wires and cables; insulation and protection.
30 CFR 75.517 · $549.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $209.00 proposed penalty
103 (g) Written Notification Hazard Complaint Inspectio
6.0 on-site hours reported
Storage of materials.
30 CFR 77.208(e) · $165.00 proposed penalty
Storage of materials.
30 CFR 77.208(e) · $165.00 proposed penalty
Mechanical equipment guards.
30 CFR 75.1722(a) · Significant and substantial (S&S) · $1,219.00 proposed penalty
Condition and examination of firefighting equipment.
30 CFR 75.1100-3 · $209.00 proposed penalty
Escapeways; bituminous and lignite mines.
30 CFR 75.380(d)(6) · $959.00 proposed penalty
Condition and examination of firefighting equipment.
30 CFR 75.1100-3 · $209.00 proposed penalty
Electric equipment; examination, testing and maintenance.
30 CFR 75.512 · $209.00 proposed penalty
Electric equipment; examination, testing and maintenance.
30 CFR 75.512 · $209.00 proposed penalty
Power wires; support.
30 CFR 75.516 · $165.00 proposed penalty
Condition and examination of firefighting equipment.
30 CFR 75.1100-3 · $209.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · Significant and substantial (S&S) · $1,037.00 proposed penalty
Electric equipment; examination, testing and maintenance.
30 CFR 75.512 · Significant and substantial (S&S) · $3,448.00 proposed penalty
Electric equipment; examination, testing and maintenance.
30 CFR 75.512 · $209.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
30 CFR 75.1731(a) · $151.00 proposed penalty
Protection from falls of roof, face and ribs.
30 CFR 75.202(a) · Significant and substantial (S&S) · $465.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $177.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.