Gilbert Creek Loadout safety activity
MSHA violations, accident reports and inspections.
Safety activity
Health Technical Investigation
10.5 on-site hours reported
Loading and haulage equipment; installations.
30 CFR 77.1605(d) · $151.00 proposed penalty
Machinery and equipment; operation and maintenance.
30 CFR 77.404(a) · $151.00 proposed penalty
Regular Safety and Health Inspection
11.5 on-site hours reported
Slip or fall of person
Days away from work only
Accident narrative
Tripped on uneven ground at pump area by creek. Fell onto 6" stone mostly on EE's left side. This happen while EE and another EE were fishing out suction hose from the creek with a backhoe to hook up suction hose for creek pump
Spot Inspection
6.0 on-site hours reported
Surface installations; general.
30 CFR 77.200 · $151.00 proposed penalty
Travelways at surface installations.
30 CFR 77.205(a) · Significant and substantial (S&S) · $398.00 proposed penalty
Loading and haulage equipment; operation.
30 CFR 77.1607(cc) · $151.00 proposed penalty
Mechanical equipment guards.
30 CFR 77.400(c) · $151.00 proposed penalty
Electric equipment; examination, testing, and maintenance.
30 CFR 77.502 · $267.00 proposed penalty
Mechanical equipment guards.
30 CFR 77.400(c) · $151.00 proposed penalty
Mechanical equipment guards.
30 CFR 77.400(c) · $151.00 proposed penalty
Surface installations; general.
30 CFR 77.200 · Significant and substantial (S&S) · $398.00 proposed penalty
Loading and haulage equipment; inspection and maintenance.
30 CFR 77.1606(c) · Significant and substantial (S&S) · $1,126.00 proposed penalty
Machinery and equipment; operation and maintenance.
30 CFR 77.404(a) · Significant and substantial (S&S) · $313.00 proposed penalty
Accumulations of combustible materials.
30 CFR 77.1104 · $151.00 proposed penalty
Machinery and equipment; operation and maintenance.
30 CFR 77.404(a) · Significant and substantial (S&S) · $209.00 proposed penalty
Mechanical equipment guards.
30 CFR 77.400(c) · $151.00 proposed penalty
Surface installations; general.
30 CFR 77.200 · $642.00 proposed penalty
Travelways at surface installations.
30 CFR 77.205(b) · Significant and substantial (S&S) · $959.00 proposed penalty
Identification of circuit breakers.
30 CFR 77.904 · $193.00 proposed penalty
Electric equipment; examination, testing, and maintenance.
30 CFR 77.502 · $193.00 proposed penalty
Travelways at surface installations.
30 CFR 77.205(b) · $151.00 proposed penalty
Travelways at surface installations.
30 CFR 77.205(a) · Significant and substantial (S&S) · $959.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.