Gibson South safety activity
MSHA violations, accident reports and inspections.
Safety activity
Nonpermissible diesel-powered equipment; design and performance requirements.
30 CFR 75.1909(a)(2) · $151.00 proposed penalty
Spot Inspections
103(i) · 5.5 on-site hours reported
Escapeway maps.
30 CFR 75.1505(b) · $193.00 proposed penalty
Spot Inspections
103(i) · 6.0 on-site hours reported
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · Significant and substantial (S&S) · $432.00 proposed penalty
Spot Inspections
103(i) · 5.5 on-site hours reported
Roof control plan.
30 CFR 75.220(a)(1) · $165.00 proposed penalty
Methane monitors.
30 CFR 75.342(a)(4) · Significant and substantial (S&S) · $504.00 proposed penalty
Electric equipment; examination, testing and maintenance.
30 CFR 75.512 · $151.00 proposed penalty
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · $151.00 proposed penalty
Roof control plan.
30 CFR 75.220(a)(1) · $165.00 proposed penalty
Spot Inspections
103(i) · 5.5 on-site hours reported
On-shift examination.
30 CFR 75.362(d)(3)(ii) · Significant and substantial (S&S) · $398.00 proposed penalty
Permissible electric face equipment; maintenance.
30 CFR 75.503 · $165.00 proposed penalty
Machinery
Days away from work only
Accident narrative
While using a cutting wheel to remove a brace from a metal chute, the brace broke free and fell towards EE inadvertently causing EE to contact EE's right leg with the cutting wheel resulting in a laceration. (8) sutures were required to close the wound and EE was placed off work due to EE's restrictions.
Spot Inspections
103(i) · 5.5 on-site hours reported
Nonpermissible diesel-powered equipment; design and performance requirements.
30 CFR 75.1909(a)(1) · $151.00 proposed penalty
Dispensing of diesel fuel.
30 CFR 75.1905(b)(2) · $151.00 proposed penalty
Spot Inspections
103(i) · 6.0 on-site hours reported
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · $151.00 proposed penalty
Quantity and location of firefighting equipment.
30 CFR 75.1100-2(b) · $151.00 proposed penalty
Spot Inspections
103(i) · 8.0 on-site hours reported
Deenergization of self-propelled electric face equipment; performance requirements.
30 CFR 75.523-2(b) · Significant and substantial (S&S) · $366.00 proposed penalty
Power wires and cables; insulation and protection.
30 CFR 75.517 · $267.00 proposed penalty
Spot Inspections
103(i) · 4.5 on-site hours reported
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.