GENTRY MINE #3 safety activity
MSHA violations, accident reports and inspections.
Safety activity
Accumulation of combustible materials.
30 CFR 75.400 · $245.00 proposed penalty
Type and quality of firefighting equipment.
30 CFR 75.1100-1(a) · $151.00 proposed penalty
Protective clothing; requirements.
30 CFR 75.1720(a) · Significant and substantial (S&S) · $959.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
30 CFR 75.1731(a) · $165.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
30 CFR 75.1731(a) · $165.00 proposed penalty
Proximity detection systems.
30 CFR 75.1732(a) · Significant and substantial (S&S) · $959.00 proposed penalty
103 (g) Written Notification Hazard Complaint Inspectio
27.3 on-site hours reported
Machinery and equipment; operation and maintenance.
30 CFR 75.1725(a) · Significant and substantial (S&S) · $7,872.00 proposed penalty
Machinery and equipment; operation and maintenance.
30 CFR 75.1725(a) · $432.00 proposed penalty
103 (g) Written Notification Hazard Complaint Inspectio
9.0 on-site hours reported
Automatic fire sensor and warning device systems; examination and test requirements.
30 CFR 75.1103-8(c) · $151.00 proposed penalty
Frequency of examinations.
30 CFR 75.512-2 · $151.00 proposed penalty
Preshift examination at fixed intervals.
30 CFR 75.360(g) · $151.00 proposed penalty
Verbal Hazard Complaint Inspections
6.0 on-site hours reported
Handtools (nonpowered)
Days away from work only
Accident narrative
EE was shoveling belts on the surface. EE's shovel hit a chunk of ice. At that time EE heard a snap and EE's shoulder gave out.
Emergency Response Plan; refuge alternatives.
30 CFR 75.1507(a)(11)(ii) · $151.00 proposed penalty
Roof control plan.
30 CFR 75.220(a)(1) · $549.00 proposed penalty
Roof control plan.
30 CFR 75.220(a)(1) · $549.00 proposed penalty
Protective clothing; requirements.
30 CFR 75.1720(a) · Significant and substantial (S&S) · $959.00 proposed penalty
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · $193.00 proposed penalty
Other safeguards.
30 CFR 75.1403 · $151.00 proposed penalty
Slip or fall of person
Days restricted activity only
Accident narrative
EE was walking in mud about 15" deep and lost EE's balance. EE's left foot was stuck in the mud and twisted EE's knee while trying to catch self from falling. EE continued to work and on 3-12-25 it was getting worse and we took EE to get it checked.
Installation of high-voltage transmission cables.
30 CFR 75.807 · $193.00 proposed penalty
Permissible electric face equipment; maintenance.
30 CFR 75.503 · $193.00 proposed penalty
Multi-gas detectors.
30 CFR 75.1714-7(a) · Significant and substantial (S&S) · $6,041.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.