← GCC Dacotah Inc

GCC Dacotah Inc safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Immediate notification.

    violationRecord 5054322

    30 CFR 50.10(c) · $7,555.00 proposed penalty

  2. Spot Inspection

    inspectionRecord F014858

    2.0 on-site hours reported

  3. Examination of working places.

    violationRecord 9728248

    30 CFR 56.18002(a) · Significant and substantial (S&S) · $32,395.00 proposed penalty

  4. Safe access.

    violationRecord 9728247

    30 CFR 56.11001 · Significant and substantial (S&S) · $9,757.00 proposed penalty

  5. New task training.

    violationRecord 9728245

    30 CFR 46.7(a) · Significant and substantial (S&S) · $67,449.00 proposed penalty

  6. Safe access.

    violationRecord 9728244

    30 CFR 56.11001 · Significant and substantial (S&S) · $81,584.00 proposed penalty

  7. Handtools (nonpowered)

    accidentRecord 220251810018

    Dys awy frm wrk & restrctd act

    Accident narrative

    The employee chose a 4-foot pry bar instead of a 6-foot pry bar to open a valve on a silo pump. The employee strained and felt a pop in their shoulder.

  8. Examination of working places.

    violationRecord 5051346

    30 CFR 56.18002(a) · $1,550.00 proposed penalty

  9. Grounding circuit enclosures.

    violationRecord 5054308

    30 CFR 56.12025 · Significant and substantial (S&S) · $17,082.00 proposed penalty

  10. Immediate notification.

    violationRecord 5054307

    30 CFR 50.10(b) · $7,555.00 proposed penalty

  11. Records of training.

    violationRecord 5051345

    30 CFR 46.9(b)(5) · $465.00 proposed penalty

  12. Training plans.

    violationRecord 5051344

    30 CFR 46.3(b)(4) · $313.00 proposed penalty

  13. New task training.

    violationRecord 5051343

    30 CFR 46.7(a) · Significant and substantial (S&S) · $3,832.00 proposed penalty

  14. Inspection.

    violationRecord 5051342

    30 CFR 56.4201(a)(2) · $209.00 proposed penalty

  15. Storage of hazardous materials.

    violationRecord 5051341

    30 CFR 56.16003 · $209.00 proposed penalty

  16. High-pressure hose connections.

    violationRecord 5051340

    30 CFR 56.13021 · $549.00 proposed penalty

  17. Insulation and fittings for power wires and cables.

    violationRecord 5051339

    30 CFR 56.12008 · $549.00 proposed penalty

  18. Testing grounding systems.

    violationRecord 5054306

    30 CFR 56.12028 · $151.00 proposed penalty

  19. Records of training.

    violationRecord 5054305

    30 CFR 46.9(a) · $151.00 proposed penalty

  20. Moving machine parts.

    violationRecord 5051338

    30 CFR 56.14107(a) · $642.00 proposed penalty

  21. Safe access.

    violationRecord 9829897

    30 CFR 56.11001 · $549.00 proposed penalty

  22. Warning signs.

    violationRecord 9829896

    30 CFR 56.4101 · $193.00 proposed penalty

  23. Testing grounding systems.

    violationRecord 9829895

    30 CFR 56.12028 · $288.00 proposed penalty

  24. Spillage and leakage.

    violationRecord 5054135

    30 CFR 56.4102 · $288.00 proposed penalty

  25. Spillage and leakage.

    violationRecord 5054134

    30 CFR 56.4102 · $288.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.