← Gateway North Mine

Gateway North Mine safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Mine ventilation plan; submission and approval.

    violationRecord 5016403

    30 CFR 75.370(a)(1) · $313.00 proposed penalty

  2. Regular Safety and Health Inspection

    inspectionRecord F00C1B4

    396.3 on-site hours reported

  3. Spot Inspections

    inspectionRecord F00057E

    103(i) · 6.8 on-site hours reported

  4. Methane monitors.

    violationRecord 5016253

    30 CFR 75.342(a)(4) · $151.00 proposed penalty

  5. Spot Inspections

    inspectionRecord F00057D

    103(i) · 6.5 on-site hours reported

  6. Fire suppression systems for diesel-powered equipment and fuel transportation units.

    violationRecord 5016252

    30 CFR 75.1911(i) · $226.00 proposed penalty

  7. Nonpermissible diesel-powered equipment; electrical system design and performance requirements.

    violationRecord 5011689

    30 CFR 75.1910(j) · $226.00 proposed penalty

  8. Roof control plan.

    violationRecord 5016251

    30 CFR 75.220(a)(1) · $432.00 proposed penalty

  9. Mechanical equipment guards.

    violationRecord 5016250

    30 CFR 75.1722(c) · $755.00 proposed penalty

  10. Accumulation of combustible materials.

    violationRecord 5016249

    30 CFR 75.400 · $504.00 proposed penalty

  11. Automatic emergency-parking brakes.

    violationRecord 5016248

    30 CFR 75.523-3(b)(5) · $226.00 proposed penalty

  12. Roof control plan.

    violationRecord 5016247

    30 CFR 75.220(a)(1) · $432.00 proposed penalty

  13. Automatic emergency-parking brakes.

    violationRecord 5016246

    30 CFR 75.523-3(b)(5) · $226.00 proposed penalty

  14. Roof control plan.

    violationRecord 5016245

    30 CFR 75.220(a)(1) · $432.00 proposed penalty

  15. Escapeways; bituminous and lignite mines.

    violationRecord 5016143

    30 CFR 75.380(d)(4)(ii) · $245.00 proposed penalty

  16. Protection from falls of roof, face and ribs.

    violationRecord 5016142

    30 CFR 75.202(a) · Significant and substantial (S&S) · $1,818.00 proposed penalty

  17. Protection from falls of roof, face and ribs.

    violationRecord 5016141

    30 CFR 75.202(a) · $366.00 proposed penalty

  18. Accumulation of combustible materials.

    violationRecord 5016244

    30 CFR 75.400 · $504.00 proposed penalty

  19. Mine ventilation plan; submission and approval.

    violationRecord 5016243

    30 CFR 75.370(a)(1) · Significant and substantial (S&S) · $2,503.00 proposed penalty

  20. Accumulation of combustible materials.

    violationRecord 9789684

    30 CFR 75.400 · $504.00 proposed penalty

  21. Spot Inspections

    inspectionRecord F00C525

    103(i) · 14.0 on-site hours reported

  22. Dry chemical devices; capacity; minimum requirements.

    violationRecord 9789683

    30 CFR 75.1107-9(a)(2) · $226.00 proposed penalty

  23. Accumulation of combustible materials.

    violationRecord 9789682

    30 CFR 75.400 · $504.00 proposed penalty

  24. Warning devices.

    violationRecord 9789681

    30 CFR 75.208 · Significant and substantial (S&S) · $1,126.00 proposed penalty

  25. Protection from falls of roof, face and ribs.

    violationRecord 9789680

    30 CFR 75.202(a) · Significant and substantial (S&S) · $1,818.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.