  1. Roof control plan.

    violationRecord 9781390

    30 CFR 75.220(a)(1) · Significant and substantial (S&S) · $1,320.00 proposed penalty

  2. Accumulation of combustible materials.

    violationRecord 9781389

    30 CFR 75.400 · $432.00 proposed penalty

  3. Accumulation of combustible materials.

    violationRecord 9783878

    30 CFR 75.400 · $398.00 proposed penalty

  4. Roof control plan.

    violationRecord 9781388

    30 CFR 75.220(a)(1) · $366.00 proposed penalty

  5. Roof bolting.

    violationRecord 9781387

    30 CFR 75.204(c)(1) · $245.00 proposed penalty

  6. Roof control plan.

    violationRecord 9781386

    30 CFR 75.220(a)(1) · $366.00 proposed penalty

  7. Electric equipment; examination, testing and maintenance.

    violationRecord 9786614

    30 CFR 75.512 · $267.00 proposed penalty

  8. Electric equipment; examination, testing and maintenance.

    violationRecord 9783877

    30 CFR 75.512 · $151.00 proposed penalty

  9. Roof control plan.

    violationRecord 9781385

    30 CFR 75.220(a)(1) · $366.00 proposed penalty

  10. Roof control plan.

    violationRecord 9781384

    30 CFR 75.220(a)(1) · $366.00 proposed penalty

  11. Roof control plan.

    violationRecord 9781549

    30 CFR 75.220(a)(1) · $642.00 proposed penalty

  12. Permissible electric face equipment; maintenance.

    violationRecord 9781548

    30 CFR 75.503 · $432.00 proposed penalty

  13. Roof control plan.

    violationRecord 9781383

    30 CFR 75.220(a)(1) · $366.00 proposed penalty

  14. Roof control plan.

    violationRecord 9781382

    30 CFR 75.220(a)(1) · $366.00 proposed penalty

  15. Roof control plan.

    violationRecord 9781381

    30 CFR 75.220(a)(1) · $366.00 proposed penalty

  16. Regular Safety and Health Inspection

    inspectionRecord F00529B

    545.3 on-site hours reported

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.