← Galena

Galena safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Ground support use.

    violationRecord 5056208

    30 CFR 57.3360 · $151.00 proposed penalty

  2. Fan installations.

    violationRecord 5056207

    30 CFR 57.4504(b) · Significant and substantial (S&S) · $465.00 proposed penalty

  3. Operators' stations.

    violationRecord 5056206

    30 CFR 57.14103(c)(1) · $151.00 proposed penalty

  4. Safety defects; examination, correction and records.

    violationRecord 5056205

    30 CFR 57.14100(c) · Significant and substantial (S&S) · $432.00 proposed penalty

  5. Procedures for inspection, testing, and maintenance.

    violationRecord 5211204

    30 CFR 57.19120 · $1,037.00 proposed penalty

  6. Toilet facilities.

    violationRecord 5211205

    30 CFR 57.20008(b) · Significant and substantial (S&S) · $432.00 proposed penalty

  7. Toilet facilities.

    violationRecord 5211203

    30 CFR 57.20008(b) · Significant and substantial (S&S)

  8. Escape routes.

    violationRecord 5056204

    30 CFR 57.11051(b) · $432.00 proposed penalty

  9. Escape routes.

    violationRecord 5056203

    30 CFR 57.11051(a) · Significant and substantial (S&S) · $4,047.00 proposed penalty

  10. Escape routes.

    violationRecord 5056202

    30 CFR 57.11051(a) · Significant and substantial (S&S) · $2,133.00 proposed penalty

  11. Escape and evacuation plans.

    violationRecord 5056201

    30 CFR 57.11053(a) · $432.00 proposed penalty

  12. Verbal Hazard Complaint Inspections

    inspectionRecord F02A25C

    32.0 on-site hours reported

  13. Correction of dangerous conditions.

    violationRecord 5211202

    30 CFR 57.12030 · $288.00 proposed penalty

  14. Action level.

    violationRecord 5053500

    30 CFR 62.120 · Significant and substantial (S&S) · $366.00 proposed penalty

  15. Permissible exposure level.

    violationRecord 5053499

    30 CFR 62.130(a) · Significant and substantial (S&S) · $366.00 proposed penalty

  16. Fan installations.

    violationRecord 5053498

    30 CFR 57.4504(b) · $151.00 proposed penalty

  17. Impoundment Spot Inspection

    inspectionRecord F03671A

    1.5 on-site hours reported

  18. Protection for openings around travelways.

    violationRecord 5053497

    30 CFR 57.11012 · $151.00 proposed penalty

  19. Moving machine parts.

    violationRecord 5053496

    30 CFR 57.14107(a) · $151.00 proposed penalty

  20. Protection for openings around travelways.

    violationRecord 5053495

    30 CFR 57.11012 · Significant and substantial (S&S) · $432.00 proposed penalty

  21. Ground support use.

    violationRecord 8761094

    30 CFR 57.3360 · $432.00 proposed penalty

  22. Correction of dangerous conditions.

    violationRecord 8761093

    30 CFR 57.12030 · $288.00 proposed penalty

  23. Warning signs.

    violationRecord 5211201

    30 CFR 57.4101 · $151.00 proposed penalty

  24. Protection for openings around travelways.

    violationRecord 5056522

    30 CFR 57.11012 · Significant and substantial (S&S) · $432.00 proposed penalty

  25. Ground support use.

    violationRecord 5053494

    30 CFR 57.3360 · Significant and substantial (S&S) · $959.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.