← Freedom Mine

Freedom Mine safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-28Database snapshot · 2026-10-28

Safety activity

  1. Machinery and equipment; operation and maintenance.

    violationRecord 5212235

    30 CFR 77.404(a)

  2. Mechanical equipment guards.

    violationRecord 5212150

    30 CFR 77.400(a)

  3. Training of miners assigned to a task in which they have had no previous experience; minimum courses of instruction.

    violationRecord 5055169

    30 CFR 48.27(c) · Significant and substantial (S&S)

  4. Machinery and equipment; operation and maintenance.

    violationRecord 5212234

    30 CFR 77.404(a) · $245.00 proposed penalty

  5. Mechanical equipment guards.

    violationRecord 5212233

    30 CFR 77.400(a) · $151.00 proposed penalty

  6. Warning signs; smoking and open flame.

    violationRecord 5055168

    30 CFR 77.1102

  7. Requirement for container labels.

    violationRecord 5055167

    30 CFR 47.41(a)

  8. Travelways at surface installations.

    violationRecord 5055166

    30 CFR 77.205(a) · Significant and substantial (S&S)

  9. Experienced miner training.

    violationRecord 5055165

    30 CFR 48.26(a) · Significant and substantial (S&S)

  10. Machinery and equipment; operation and maintenance.

    violationRecord 5212232

    30 CFR 77.404(a) · $151.00 proposed penalty

  11. Machinery and equipment; operation and maintenance.

    violationRecord 5212231

    30 CFR 77.404(a) · $245.00 proposed penalty

  12. Machinery and equipment; operation and maintenance.

    violationRecord 5212230

    30 CFR 77.404(a)

  13. Training of new miners; minimum courses of instruction; hours of instruction.

    violationRecord 5055164

    30 CFR 48.25(a) · Significant and substantial (S&S)

  14. Loading and haulage equipment; inspection and maintenance.

    violationRecord 5055163

    30 CFR 77.1606(a) · $151.00 proposed penalty

  15. Loading and haulage equipment; inspection and maintenance.

    violationRecord 5055162

    30 CFR 77.1606(c) · $151.00 proposed penalty

  16. Travelways at surface installations.

    violationRecord 5055161

    30 CFR 77.205(b)

  17. Travelways at surface installations.

    violationRecord 5055160

    30 CFR 77.205(e) · Significant and substantial (S&S)

  18. Violation — cited standard not reported

    violationRecord 5055159
  19. Loading and haulage equipment; inspection and maintenance.

    violationRecord 5212229

    30 CFR 77.1606(c)

  20. Storage of materials.

    violationRecord 5212228

    30 CFR 77.208(b) · $151.00 proposed penalty

  21. Mechanical equipment guards.

    violationRecord 5212227

    30 CFR 77.400(a)

  22. Accumulations of combustible materials.

    violationRecord 5212226

    30 CFR 77.1104 · $165.00 proposed penalty

  23. Mobile equipment; rollover protective structures (ROPS).

    violationRecord 5212225

    30 CFR 77.403-1(g) · Significant and substantial (S&S) · $1,219.00 proposed penalty

  24. Accumulations of combustible materials.

    violationRecord 5212224

    30 CFR 77.1104 · $165.00 proposed penalty

  25. Loading and haulage equipment; operation.

    violationRecord 5212345

    30 CFR 77.1607(b) · $151.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.