Francisco Underground Pit safety activity
MSHA violations, accident reports and inspections.
Safety activity
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · $959.00 proposed penalty
Regular Safety and Health Inspection
669.8 on-site hours reported
Spot Inspections
103(i) · 3.0 on-site hours reported
Spot Inspections
103(i) · 5.0 on-site hours reported
Spot Inspections
103(i) · 9.0 on-site hours reported
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · $465.00 proposed penalty
On-shift examination.
30 CFR 75.362(d)(1)(ii) · Significant and substantial (S&S) · $549.00 proposed penalty
Spot Inspections
103(i) · 5.0 on-site hours reported
Permissible electric face equipment; maintenance.
30 CFR 75.503 · $366.00 proposed penalty
Permissible electric face equipment; maintenance.
30 CFR 75.503 · Significant and substantial (S&S) · $1,679.00 proposed penalty
Handling of materials
Days away from work only
Accident narrative
IE caught their left arm between a set of equipment doors while trying to enter the intake aircourse causing a fracture to the ulnar bone between their wrist and elbow.
Accumulation of combustible materials.
30 CFR 75.400 · $504.00 proposed penalty
Nonpermissible diesel-powered equipment; electrical system design and performance requirements.
30 CFR 75.1910(d) · $226.00 proposed penalty
Roof control plan.
30 CFR 75.220(a)(1) · $366.00 proposed penalty
Health Technical Investigation
7.3 on-site hours reported
Spot Inspections
103(i) · 5.5 on-site hours reported
Roof control plan.
30 CFR 75.220(a)(1) · $336.00 proposed penalty
Water sprinkler systems; fire warning devices at belt drives.
30 CFR 75.1101-10 · Significant and substantial (S&S) · $504.00 proposed penalty
Roof control plan.
30 CFR 75.220(a)(1) · $313.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $504.00 proposed penalty
Spot Inspections
103(i) · 7.8 on-site hours reported
Methane monitors.
30 CFR 75.342(a)(4) · Significant and substantial (S&S) · $592.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $504.00 proposed penalty
Nonpermissible diesel-powered equipment; electrical system design and performance requirements.
30 CFR 75.1910(i) · $226.00 proposed penalty
Nonpermissible diesel-powered equipment; electrical system design and performance requirements.
30 CFR 75.1910(d) · $151.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.