Francisco Underground Pit safety activity
MSHA violations, accident reports and inspections.
Safety activity
Accumulation of combustible materials.
30 CFR 75.400 · $504.00 proposed penalty
Spot Inspections
103(i) · 8.0 on-site hours reported
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · $959.00 proposed penalty
Maintenance of diesel-powered equipment.
30 CFR 75.1914(a) · Significant and substantial (S&S) · $1,320.00 proposed penalty
Protection of low- and medium-voltage three-phase circuits used underground.
30 CFR 75.901(b)(12) · $151.00 proposed penalty
Nonpermissible diesel-powered equipment; electrical system design and performance requirements.
30 CFR 75.1910(d) · $151.00 proposed penalty
Spot Inspections
103(i) · 6.3 on-site hours reported
Quantity and location of firefighting equipment.
30 CFR 75.1100-2(b) · $226.00 proposed penalty
Electric equipment; examination, testing and maintenance.
30 CFR 75.512 · $226.00 proposed penalty
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · $465.00 proposed penalty
Ventilation controls.
30 CFR 75.333(c) · $151.00 proposed penalty
Maintenance of incombustible content of rock dust.
30 CFR 75.403 · $151.00 proposed penalty
Maintenance of incombustible content of rock dust.
30 CFR 75.403 · $151.00 proposed penalty
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · Significant and substantial (S&S) · $2,312.00 proposed penalty
Nonpermissible diesel-powered equipment; design and performance requirements.
30 CFR 75.1909(b)(4) · $226.00 proposed penalty
Electric equipment; examination, testing and maintenance.
30 CFR 75.512 · $151.00 proposed penalty
Spot Inspections
103(i) · 7.8 on-site hours reported
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · $465.00 proposed penalty
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · $959.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $504.00 proposed penalty
Automatic emergency-parking brakes.
30 CFR 75.523-3(b)(5) · $226.00 proposed penalty
Spot Inspections
103(i) · 7.0 on-site hours reported
Methane monitors.
30 CFR 75.342(a)(4) · $151.00 proposed penalty
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · $465.00 proposed penalty
Spot Inspections
103(i) · 8.5 on-site hours reported
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.