← Francisco Underground Pit

Francisco Underground Pit safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Preshift examination at fixed intervals.

    violationRecord 9785645

    30 CFR 75.360(a)(1) · Significant and substantial (S&S)

  2. Air quality.

    violationRecord 9785644

    30 CFR 75.321(a)(1) · Significant and substantial (S&S)

  3. Mine ventilation plan; submission and approval.

    violationRecord 9785643

    30 CFR 75.370(a)(1) · Significant and substantial (S&S)

  4. Drill dust control at underground areas of underground mines.

    violationRecord 5014625

    30 CFR 72.630(b) · Significant and substantial (S&S)

  5. Mine ventilation plan; submission and approval.

    violationRecord 5014624

    30 CFR 75.370(a)(1) · Significant and substantial (S&S)

  6. Accumulation of combustible materials.

    violationRecord 5014273

    30 CFR 75.400

  7. Escapeways; bituminous and lignite mines.

    violationRecord 5014272

    30 CFR 75.380(d)(4)(iv) · Significant and substantial (S&S)

  8. Spot Inspections

    inspectionRecord F01B955

    103(i) · 0.0 on-site hours reported

  9. Permissible electric face equipment; maintenance.

    violationRecord 9785642

    30 CFR 75.503

  10. Fire suppression systems for diesel-powered equipment and fuel transportation units.

    violationRecord 5014623

    30 CFR 75.1911(i) · Significant and substantial (S&S)

  11. Methane monitors.

    violationRecord 5014622

    30 CFR 75.342(a)(4)

  12. Accumulation of combustible materials.

    violationRecord 5014271

    30 CFR 75.400

  13. Accumulation of combustible materials.

    violationRecord 5014270

    30 CFR 75.400

  14. Weekly examination.

    violationRecord 5014269

    30 CFR 75.364(g)

  15. Weekly examination.

    violationRecord 5014268

    30 CFR 75.364(b)(5) · Significant and substantial (S&S)

  16. Escapeways; bituminous and lignite mines.

    violationRecord 5014267

    30 CFR 75.380(d)(1) · Significant and substantial (S&S)

  17. Mine ventilation plan; submission and approval.

    violationRecord 9785641

    30 CFR 75.370(a)(1) · Significant and substantial (S&S)

  18. Mine ventilation plan; submission and approval.

    violationRecord 9785640

    30 CFR 75.370(a)(1) · Significant and substantial (S&S)

  19. Violation — cited standard not reported

    violationRecord 5014620
  20. Mine ventilation plan; submission and approval.

    violationRecord 5014619

    30 CFR 75.370(a)(1) · Significant and substantial (S&S)

  21. Spot Inspections

    inspectionRecord F039FD1

    103(i) · 5.5 on-site hours reported

  22. Mine ventilation plan; submission and approval.

    violationRecord 5014618

    30 CFR 75.370(a)(1) · Significant and substantial (S&S)

  23. Mine ventilation plan; submission and approval.

    violationRecord 9785639

    30 CFR 75.370(a)(1) · Significant and substantial (S&S)

  24. Accumulation of combustible materials.

    violationRecord 9780754

    30 CFR 75.400

  25. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 9780753

    30 CFR 75.1731(b)

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.