Fola Surface Mine No 2 safety activity
MSHA violations, accident reports and inspections.
Safety activity
Spot Inspection
10.0 on-site hours reported
Health Technical Investigation
12.3 on-site hours reported
Loading and haulage equipment; inspection and maintenance.
30 CFR 77.1606(a)
Accumulations of combustible materials.
30 CFR 77.1104
Machinery and equipment; operation and maintenance.
30 CFR 77.404(a) · Significant and substantial (S&S)
Regular Safety and Health Inspection
81.3 on-site hours reported
Electric equipment; frequency of examination and testing.
30 CFR 77.502-2 · $151.00 proposed penalty
First-Aid training; supervisory employees.
30 CFR 77.1703 · $151.00 proposed penalty
Regular Safety and Health Inspection
28.0 on-site hours reported
Mine map.
30 CFR 77.1200 · $151.00 proposed penalty
Loading and haulage equipment; operation.
30 CFR 77.1607(i) · $151.00 proposed penalty
Loading and haulage equipment; operation.
30 CFR 77.1607(i) · $151.00 proposed penalty
Loading and haulage equipment; installations.
30 CFR 77.1605(d) · $151.00 proposed penalty
Electric equipment; frequency of examination and testing.
30 CFR 77.502-2 · $151.00 proposed penalty
Loading and haulage equipment; installations.
30 CFR 77.1605(d) · $151.00 proposed penalty
Mobile equipment; automatic warning devices.
30 CFR 77.410(b) · $151.00 proposed penalty
Loading and haulage equipment; operation.
30 CFR 77.1607(i) · $151.00 proposed penalty
Drilling; general.
30 CFR 77.1007(b) · $151.00 proposed penalty
Loading and haulage equipment; inspection and maintenance.
30 CFR 77.1606(c) · $151.00 proposed penalty
Regular Safety and Health Inspection
102.8 on-site hours reported
Special Emphasis Programs
1.0 on-site hours reported
Spot Inspection
12.0 on-site hours reported
Protective clothing; requirements.
30 CFR 77.1710(g) · Significant and substantial (S&S) · $267.00 proposed penalty
Daily inspection of surface coal mine; certified person; reports of inspection.
30 CFR 77.1713(a) · Significant and substantial (S&S) · $3,022.00 proposed penalty
Highwalls, pits and spoil banks; plans.
30 CFR 77.1000 · Significant and substantial (S&S) · $3,022.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.