FOIDEL CREEK MINE safety activity
MSHA violations, accident reports and inspections.
Safety activity
Quantity and location of firefighting equipment.
30 CFR 75.1100-2(f) · $336.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $883.00 proposed penalty
Machinery and equipment; operation and maintenance.
30 CFR 75.1725(a) · $504.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
30 CFR 75.1731(a) · $642.00 proposed penalty
Certified person; sampling.
30 CFR 70.202(a) · $151.00 proposed penalty
Regular Safety and Health Inspection
329.5 on-site hours reported
Compliance Follow-up Inspection
17.3 on-site hours reported
Requirement for container labels.
30 CFR 47.41(a) · $288.00 proposed penalty
Inspection and cover plates.
30 CFR 77.512 · $288.00 proposed penalty
Inspection and cover plates.
30 CFR 77.512 · $288.00 proposed penalty
Examination and maintenance of firefighting equipment.
30 CFR 77.1110 · $288.00 proposed penalty
Underground sanitary facilities; installation and maintenance.
30 CFR 75.1712-6(c) · $193.00 proposed penalty
Underground sanitary facilities; installation and maintenance.
30 CFR 75.1712-6(b) · $193.00 proposed penalty
Installation of electric equipment and conductors; permissibility.
30 CFR 75.1002(a) · $313.00 proposed penalty
Installation of electric equipment and conductors; permissibility.
30 CFR 75.1002(a) · $1,037.00 proposed penalty
Machinery and equipment; operation and maintenance.
30 CFR 75.1725(a) · $1,219.00 proposed penalty
Testing, examination and maintenance.
30 CFR 75.821(a) · $959.00 proposed penalty
Electric equipment; examination, testing and maintenance.
30 CFR 75.512 · $1,037.00 proposed penalty
Quarterly sampling; mechanized mining units.
30 CFR 70.208(e)(3) · $151.00 proposed penalty
Installation of electric equipment and conductors; permissibility.
30 CFR 75.1002(a) · $1,037.00 proposed penalty
Escapeways; bituminous and lignite mines.
30 CFR 75.380(d)(7)(iv) · $313.00 proposed penalty
Nonpermissible diesel-powered equipment; design and performance requirements.
30 CFR 75.1909(b)(5) · $288.00 proposed penalty
Ventilation controls.
30 CFR 75.333(c)(3) · $336.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $697.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
30 CFR 75.1731(a) · $504.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.