FOIDEL CREEK MINE safety activity
MSHA violations, accident reports and inspections.
Safety activity
Examination and maintenance of firefighting equipment.
30 CFR 77.1110 · $267.00 proposed penalty
Escapeways; bituminous and lignite mines.
30 CFR 75.380(d)(1) · Significant and substantial (S&S) · $3,736.00 proposed penalty
Ventilation controls.
30 CFR 75.333(c)(2) · $267.00 proposed penalty
Protection from falls of roof, face and ribs.
30 CFR 75.202(a) · $336.00 proposed penalty
Inspection and cover plates.
30 CFR 77.512 · $267.00 proposed penalty
Installation of high-voltage transmission cables.
30 CFR 75.807 · $267.00 proposed penalty
Electric equipment and circuits; overload and short circuit protection; minimum requirements.
30 CFR 75.518-1 · Significant and substantial (S&S) · $1,320.00 proposed penalty
Installation of high-voltage transmission cables.
30 CFR 75.807 · $267.00 proposed penalty
Electrical connections or splices; suitability.
30 CFR 75.514 · $288.00 proposed penalty
Escapeways; bituminous and lignite mines.
30 CFR 75.380(d)(7)(iv) · $267.00 proposed penalty
Electrical connections or splices; suitability.
30 CFR 75.514 · $267.00 proposed penalty
Preshift examination at fixed intervals.
30 CFR 75.360(f) · $549.00 proposed penalty
Regular Safety and Health Inspection
493.5 on-site hours reported
Handtools (nonpowered)
No dys awy frm wrk,no rstr act
Accident narrative
IE stated that IE was trying to unplug a chute in the prep plant screen building using a scaling bar. IE was attempting to bust up material from the chute working upwards. The debris came loose falling below. The weight of the material sloughed down the chute catching the bar. The bar springboarded upward striking the IE on the left jaw, causing a laceration requiring 13 sutures.
Compliance Follow-up Inspection
4.8 on-site hours reported
Slip or fall of person
No dys awy frm wrk,no rstr act
Accident narrative
Employee states that employee was dragging ventilation tubing and tripped landing on knee. Employee says that the knee landed on a rock or chunk of coal.
Fire suppression systems for diesel-powered equipment and fuel transportation units.
30 CFR 75.1911(i) · $267.00 proposed penalty
Maintenance of diesel-powered equipment.
30 CFR 75.1914(a) · $267.00 proposed penalty
Nonpermissible diesel-powered equipment; design and performance requirements.
30 CFR 75.1909(d) · Significant and substantial (S&S) · $1,320.00 proposed penalty
Handling of materials
Days away from work only
Accident narrative
IE was installing a roof bolt. While holding the bolt in the drilled hole, the bolt inadvertently moved, bending the bolt causing EE's hand to get caught between the drill chuck and the drill guide. This caused a laceration that required sutures.
Storage of liquefied and nonliquefied compressed gas cylinders; requirements.
30 CFR 75.1106-3(a)(2) · $504.00 proposed penalty
Condition and examination of firefighting equipment.
30 CFR 75.1100-3 · $592.00 proposed penalty
Status change reports.
30 CFR 70.212(a) · $151.00 proposed penalty
Mechanical equipment guards.
30 CFR 77.400(a) · $288.00 proposed penalty
Storage of materials.
30 CFR 77.208(e) · $267.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.