Maintenance of incombustible content of rock dust.
30 CFR 75.403 · $209.00 proposed penalty
Maintenance of incombustible content of rock dust.
30 CFR 75.403 · $432.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
30 CFR 75.1731(a) · $1,219.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · Significant and substantial (S&S) · $2,936.00 proposed penalty
Machinery
Days away from work only
Accident narrative
IE Grabbed a rotating drill steel causing their glove to get wrapped around drill steel, jamming their fingers into their wrist
Violation — cited standard not reported
Significant and substantial (S&S) · $13,782.00 proposed penalty
Escapeways; bituminous and lignite mines.
30 CFR 75.380(d)(7)(iv) · Significant and substantial (S&S) · $5,574.00 proposed penalty
Protection from falls of roof, face and ribs.
30 CFR 75.202(a) · $336.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $592.00 proposed penalty
Other safeguards.
30 CFR 75.1403 · $267.00 proposed penalty
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · Significant and substantial (S&S) · $4,749.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $592.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $592.00 proposed penalty
Escapeways; bituminous and lignite mines.
30 CFR 75.380(d)(7)(vi) · $592.00 proposed penalty
Escapeways; bituminous and lignite mines.
30 CFR 75.380(d)(7)(vi) · $592.00 proposed penalty
Ventilation controls.
30 CFR 75.333(c)(2) · $267.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $1,219.00 proposed penalty
Escapeways; bituminous and lignite mines.
30 CFR 75.380(d)(1) · Significant and substantial (S&S) · $1,320.00 proposed penalty
Self-rescue devices; use and location requirements.
30 CFR 75.1714-2(c) · Significant and substantial (S&S) · $4,383.00 proposed penalty
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · $398.00 proposed penalty
Machinery and equipment; operation and maintenance.
30 CFR 75.1725(a) · $288.00 proposed penalty
Storage of liquefied and nonliquefied compressed gas cylinders; requirements.
30 CFR 75.1106-3(a)(1) · $267.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
30 CFR 75.1731(a) · $366.00 proposed penalty
Mechanical equipment guards.
30 CFR 75.1722(a) · Significant and substantial (S&S) · $1,968.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
30 CFR 75.1731(a) · $366.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.