Flying Eagle safety activity
MSHA violations, accident reports and inspections.
Safety activity
Accumulation of combustible materials.
30 CFR 75.400 · Significant and substantial (S&S) · $2,936.00 proposed penalty
Roof control plan.
30 CFR 75.220(a)(1) · Significant and substantial (S&S) · $10,569.00 proposed penalty
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · $504.00 proposed penalty
Fall of roof or back
No dys awy frm wrk,no rstr act
Accident narrative
Employee stated EE was installing roof bolts in the #2 entry when a piece of draw rock fell, striking EE on the right side of EE's head. This caused a laceration to EE's right cheek that required sutures. Employee returned to work on EE's next shift with a full duty release.
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · $5,574.00 proposed penalty
Protection from falls of roof, face and ribs.
30 CFR 75.202(a) · Significant and substantial (S&S) · $2,503.00 proposed penalty
Additional self-contained self-rescuers (SCSRs).
30 CFR 75.1714-4(c)(2)(ii) · $1,968.00 proposed penalty
Escapeways; bituminous and lignite mines.
30 CFR 75.380(d)(1) · $1,679.00 proposed penalty
Electric equipment; examination, testing and maintenance.
30 CFR 75.512 · $313.00 proposed penalty
Condition and examination of firefighting equipment.
30 CFR 75.1100-3 · $151.00 proposed penalty
Protection from falls of roof, face and ribs.
30 CFR 75.202(a) · Significant and substantial (S&S) · $3,736.00 proposed penalty
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · Significant and substantial (S&S) · $1,679.00 proposed penalty
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · Significant and substantial (S&S) · $3,736.00 proposed penalty
Other safeguards.
30 CFR 75.1403 · $245.00 proposed penalty
Mechanical equipment guards.
30 CFR 75.1722(c) · $165.00 proposed penalty
Actions for excessive methane.
30 CFR 75.323(a) · $151.00 proposed penalty
Protection from falls of roof, face and ribs.
30 CFR 75.202(a) · Significant and substantial (S&S) · $2,503.00 proposed penalty
Fall of face/rib/pillar/side/highwall
Days away from work only
Accident narrative
Employee stated that EE had backed the miner out to set over in the cut when a section of the rib rolled out and struck EE on the right hip/back and leg. Employee was treated and released by a doctor and continued to work until 2/24/2025 when EE went back to EE's doctor and was taken off work.
Regular Safety and Health Inspection
141.8 on-site hours reported
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · $398.00 proposed penalty
Actions for excessive methane.
30 CFR 75.323(a) · $818.00 proposed penalty
Automatic fire sensor and warning device systems; installation; minimum requirements.
30 CFR 75.1103-4(a)(1)(ii) · $245.00 proposed penalty
Protection from falls of roof, face and ribs.
30 CFR 75.202(a) · $504.00 proposed penalty
Preshift examination at fixed intervals.
30 CFR 75.360(g) · $151.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.